BLD-Conference | 6/9/2004 | 6/15/2004 | 6/15/2004 | P | PASS |
Tony Young
|
|
|
Ron or Jim, need to verify final letter for s. i.
letter recieved 6/16/2004 12:14:44 PM
|
BLD-Final | 6/9/2004 | 6/9/2004 | 6/9/2004 | P | PART |
Tony Young
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
all ok,, just need final letter from engineer on special inspections as per the permit states,, ok to move in if needed 6/9/2004 3:59:37 PM
|
BLD-Grading Inspection | 6/4/2004 | 6/4/2004 | 6/4/2004 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
BLD-Wall cover | 9/9/2003 | 9/10/2003 | 9/10/2003 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/9/2003 at 7:59:03 AM. Contact: ###-####.
energy code ok 9/10/2003 10:41:18 AM
|
BLD-Framing/Rough-in | 8/29/2003 | 9/4/2003 | 9/4/2003 | P | PASS |
Dave Hannah
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Marc Lileks 9/4/2003 8:41:02 PM
|
BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 1:33:22 PM. Contact: ###-####.
main room rafters ok to cover 8/7/2003 3:48:14 PM
|
BLD-Framing/Rough-in | 5/29/2003 | 5/30/2003 | 5/30/2003 | A | PART |
Tony Young
|
|
|
ron shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok to cover mech. room and garage fronts 5/30/2003 9:57:08 AM
|
BLD-Framing/Rough-in | 5/20/2003 | 5/22/2003 | 5/22/2003 | A | PART |
Tony Young
|
|
|
ron ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ext. shear ok 5/22/2003 11:59:26 AM
|
BLD-Framing/Rough-in | 5/2/2003 | 5/5/2003 | 5/5/2003 | A | PART |
Tony Young
|
|
|
ron shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
conf. only, nailing ok so far 5/5/2003 1:31:04 PM
|
BLD-Framing/Rough-in | 5/5/2003 | 5/5/2003 | 5/5/2003 | P | CANC |
Tony Young
|
|
|
ron ###-####,, shear
|
BLD-Grading Inspection | 3/26/2003 | 3/26/2003 | 3/26/2003 | | PASS |
Rita DeYoung
|
|
|
Received engineer's certification of the footing subgrade
|
BLD-Conference | 10/18/2002 | 10/21/2002 | 10/21/2002 | A | DONE |
Steven Webb
|
|
|
slab insul
|
BLD-Conference | 10/17/2002 | 10/18/2002 | 10/18/2002 | A | NR |
Carl Dependahl
|
|
|
energy code for foundation wall ###-#### call to meet there...recall when ready 10/18/02 2:43:19 PM
|
BLD-Footing | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | PART |
Tony Young
|
|
|
###-####
garage ftgs, ok 10/11/2002 11:03:07 AM
|
BLD-Foundation | 9/27/2002 | 9/30/2002 | 9/30/2002 | A | PART |
Dave Hannah
|
|
|
DONNY; Phone #: ###-#### Internet Inspection Request from: Darla Downs front section 9/30/2002 11:23:31 AM
|
BLD-Footing | 9/13/2002 | 9/16/2002 | 9/16/2002 | A | PART |
Tony Young
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wip on main floor ftgs, pending soil rpt 9/16/2002 10:28:26 AM
|
BLD-Foundation | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | PART |
Tony Young
|
|
|
donny ; Phone #: ###-####
basement wall and retaining wall, wip 8/13/2002 11:20:30 AM
|
BLD-Footing | 7/24/2002 | 7/25/2002 | 7/25/2002 | P | PART |
Tony Young
|
|
|
ft insp don ###-####
basement ftgs, ok pending s. i. report 7/25/2002 3:19:30 PM
|
BLD-Footing | 7/16/2002 | 7/17/2002 | 7/17/2002 | A | PART |
Dave Hannah
|
|
|
donnie ; Phone #: ###-#### lower ftg between piers 7/17/2002 11:09:04 AM
|
BLD-Grading Inspection | 7/17/2002 | 7/17/2002 | 7/17/2002 | | PASS |
Rita DeYoung
|
|
|
Subgrade for two piers at rear of house has been approved by the geotechnical engineer.
|
BLD-Footing | 7/10/2002 | 7/15/2002 | 7/15/2002 | A | PART |
Tony Young
|
|
|
donny- ###-#### ft
2 cololms at rear,, mti soil eng. on site and s.i. onsite for steel and concrete,,, all pending report 7/15/2002 11:25:59 AM
|
BLD-Footing | 7/9/2002 | 7/12/2002 | 7/10/2002 | A | CANC |
Tony Young
|
|
|
###-####--cancel per donny
|
BLD-Footing | 7/9/2002 | 7/11/2002 | 7/10/2002 | A | CANC |
Tony Young
|
|
|
###-####---cancel per donny
|