Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-01028
StatusFinaled
Name INTERNATIONAL HOUSE OF PANCAKES
Site Address 7959 W EMERALD
Project NameIHOP #9899
Customer Number 
ePlanReviewNo
Description
IHOP * To construct a 4,985 sq. ft. one story, Type VN restaurant on a developed pad. Other work will include grading, paving, landscaping and lighting and as shown on the approved plans and attachments. DRH01-00155 CUP73-00093 .
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/1/200211/1/200211/1/2002PPASS
DetailsRuss Owen
JOE ###-#### ok perm oc. 11/1/2002 1:34:10 PM
Permanent Occupancy 11/1/200211/1/2002 DONE
Details
BLD-Final10/31/200210/31/200210/31/2002PCANC
DetailsRuss Owen
###-####
BLD-Final10/15/200210/16/200210/16/2002APART
DetailsRuss Owen
###-#### Ok temp oc c/n posted and needs all other req signatures. 10/16/2002 12:38:33 PM
Code Occupancy Approval10/17/200210/16/200210/16/2002APASS
DetailsScott M.Brown
ALL CONDITIONS MET SO SIGNED FINAL OCCUPANCY 10/17/2002 9:20:15 AM
FIRE-Final Inspection10/16/200210/16/200210/16/2002PPASS
DetailsTroy Cobbley
fire life/safety finaled 10/16/2002 8:58:22 AM
BLD-Final10/14/200210/15/200210/15/2002PNR
DetailsSteven Webb
###-#### Need all sign-offs prior to final inspection. 10/15/2002 3:00:35 PM
FIRE-Final Inspection10/14/200210/15/200210/15/2002PFAIL
DetailsTroy Cobbley
Barrell on the fire hydrant needs to be turned so the 4" outlet points over the curb (south) all other items are ok 10/15/2002 2:26:55 PM
FIRE-Alarm Testing10/10/200210/11/200210/11/2002PPASS
DetailsTroy Cobbley
Inspection was for the kitchen hood system. The hood operated properly with all caps blowing off, power, gas and make up air shutting off 10/11/2002 3:06:01 PM
BLD-Other10/3/200210/3/200210/3/2002ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/03/2002 at 07:05:45. Contact: ###-####.
BLD-Other10/3/200210/3/200210/3/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/03/2002 at 08:21:07. Contact: ###-####. grid ok 10/3/2002 3:28:18 PM
BLD-Other10/2/200210/2/200210/2/2002PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/02/2002 at 07:52:23. Contact: ###-####. needs electrical and mechanical and also work needs to be complete. I should have not been called out at this time I have spoke with contractor at a prior inspection about calling inspections when work is complteted. As we have a 2 times a day which we will be AM and PM . there is no need to call for an inspection unless work is complete. 10/2/2002 2:06:52 PM
BLD-Framing/Rough-in9/5/20029/5/20029/5/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 09/05/2002 at 08:02:19. Contact: ###-####. Just need to repair draftstop at penetrations. Contractor notified. also complete below beam at rest room other items ok./5/2002 2:24:19 PM 9/5/2002 2:24:40 PM
BLD-Framing/Rough-in9/3/20029/4/20029/4/2002ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 09/03/2002 at 12:07:48. Contact: ###-####.did this 9/3. 9/4/2002 9:45:02 AM
BLD-Wall cover8/29/20029/3/20029/3/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/29/2002 at 08:41:08. Contact: ###-####. need draft stops and roof starps added below ceiling contractor on site will recall all of which are prior c/ns. 9/3/2002 4:29:00 PM
BLD-Energy code compliance8/29/20028/29/20028/29/2002PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/29/2002 at 08:40:14. Contact: ###-####.c/n posted same corrections. 8/29/2002 4:46:58 PM
BLD-Other8/27/20028/27/20028/27/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/27/2002 at 09:20:57. Contact: ###-####.dumpster. Also talked with framer and advised to wait for the engineers revisions before performing any repairs. 8/27/2002 1:50:30 PM
BLD-Energy code compliance8/23/20028/26/20028/26/2002ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/23/2002 at 14:20:50. Contact: ###-####.
BLD-Framing/Rough-in8/23/20028/26/20028/26/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/23/2002 at 14:20:07. Contact: ###-####.c/n posted. 8/26/2002 3:01:19 PM
BLD-Wall cover8/23/20028/26/20028/26/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/23/2002 at 14:21:29. Contact: ###-####.
BLD-Framing/Rough-in8/21/20028/22/20028/22/2002ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 08/21/2002 at 15:11:20. Contact: ###-####. out of time am resch for pm 8/22/2002 12:47:05 PM
BLD-Framing/Rough-in8/22/20028/22/20028/22/2002PPART
DetailsDave Hannah
shear ok to cover ext walls ok to insulate ext walls need to fix diagonal bracing roof to wall per engineering 8/22/2002 2:26:56 PM
BLD-Framing/Rough-in8/20/20028/21/20028/21/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/20/2002 at 15:23:56. Contact: ###-####. Ok to cover roof only interior and exterior have not been inspected, Note: contractor has asked me if ok to insulate and I have told him no as it is not ready and They have never called for interior framing or exterior shear inspection roof area only. 8/21/2002 3:28:24 PM
BLD-Foundation8/17/20028/19/20028/19/2002PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/17/2002 at 09:37:25. Contact: ###-####.trash enclosure. 8/19/2002 3:31:34 PM
BLD-Framing/Rough-in8/19/20028/19/20028/19/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/19/2002 at 09:09:36. Contact: ###-####.partial on roof needs south parpet completed. 8/19/2002 4:09:53 PM
BLD-Framing/Rough-in8/14/20028/15/20028/15/2002PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/14/2002 at 11:05:22. Contact: ###-####.verbal c/n with contractor on site will recall. 8/15/2002 4:37:54 PM
BLD-Concrete7/24/20027/25/20027/25/2002PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/24/2002 at 16:22:56. Contact: ###-####.
BLD-Footing7/16/20027/17/20027/17/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/16/2002 at 13:34:02. Contact: ###-####.ok first pour of 2, new detail from engineer. 7/17/2002 11:13:27 AM
BLD-Footing7/12/20027/15/20027/15/2002PFAIL
DetailsRuss Owen
JACK- ###-#### FTContractor on site footing and general, I told them to contact the engineer as footing cold joint would not be as per plan. Need a new detail. They said they would call me back to confirm. Do not pour at this time. 7/15/2002 5:39:56 PM