BLD-Final | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 10:36:06 AM. Contact: ###-####. OK for Perm Occ. :) 12/8/2003 4:18:13 PM
|
Permanent Occupancy | | 12/8/2003 | 12/8/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/26/2003 | 11/26/2003 | 11/26/2003 | | |
Troy Cobbley
|
|
|
Final - approved by Troy Cobbley
|
FIRE-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 | P | PART |
Troy Cobbley
|
|
|
A temp occupancy was given until adequate batteries are provided for the Nac panel. All other life safety items are ok
|
Code Occupancy Approval | | | 11/20/2003 | | PASS |
|
|
|
|
BLD-Wall cover | 8/28/2003 | 8/29/2003 | 8/29/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 4:36:08 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/25/2003 | 8/26/2003 | 8/26/2003 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 8/25/2003 at 11:54:00 AM. Contact: ###-####. C/N ok to insulate. 8/26/2003 10:38:08 AM
|
BLD-Wall cover | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 8/19/2003 at 6:46:03 PM. Contact: ###-####.ok to side. 8/26/2003 9:57:59 AM
|
BLD-Framing/Rough-in | 7/29/2003 | 7/30/2003 | 7/30/2003 | P | PART |
Russ Owen
|
|
|
###-#### Ok some areas painted in green. 7/30/2003 4:57:03 PM
|
BLD-Framing/Rough-in | 7/25/2003 | 7/28/2003 | 7/28/2003 | A | CANC |
Russ Owen
|
|
|
###-#### vincent
|
BLD-Aging Inspection | 3/14/2003 | 3/14/2003 | 3/14/2003 | | CANC |
Russ Owen
|
|
|
still work 3/17/2003 9:38:32 AM
|