Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01069
StatusFinaled
Name PENTALON CONSTRUCTION, INC.
Site Address 8521 W FAIRVIEW
Project NameASPEN SPRINGS APARTMENTS
Customer Number 
ePlanReviewNo
Description
Building 2 Type B Section 1) * A two hour area separation wall will be constructed to divide this building into two separate buildings. * To construct a new 10,132 sq.ft. two story with a basement, 12 unit apartment building. The basement is approximately 3,516 sq.ft. and the first and second floor are approximately 3,308 sq.ft each. All construction is per the approved plans and attached comment list. Work to include on site landscaping and parking lot. Refer to BLD 02-02719 for other side of area separation wall. MJPDRH02-00005 CUP01-00164 PC#282-02
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/2/200312/2/200312/2/2003 DONE
final ok for perm. occ./Jim
Permanent Occupancy 12/2/200312/2/2003 DONE
Details
BLD-Final10/16/200310/16/200310/16/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/16/2003 at 9:25:38 AM. Contact: ###-####. C/N Need Perm Occ from Fire.....Struct OK after that. OK for Temp Occ. 10/16/2003 1:36:10 PM
BLD-Final10/13/200310/13/200310/13/2003PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/13/2003 at 9:30:53 AM. Contact: ###-####.
FIRE-Final Inspection10/10/200310/10/200310/10/2003PPART
DetailsTroy Cobbley
Temp occupancy given until the NAC panel for the fire alarm system can be replaced
FIRE-Final Inspection10/8/200310/8/200310/8/2003PFAIL
DetailsTroy Cobbley
Life safety is ok but need to final fire alarm 10/8/2003 3:34:45 PM
FIRE-Final Inspection10/6/200310/6/200310/6/2003PFAIL
DetailsTroy Cobbley
no fire extinguishers installed, door hinges not adjusted, smoke detectors not tested 10/6/2003 3:28:23 PM
BLD-Framing/Rough-in8/1/20038/4/20038/4/2003APART
DetailsRuss Owen
vincent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. gyp crete ok. 8/6/2003 12:48:59 PM gyp crete ok. 8/6/2003 12:49:09 PM
BLD-Framing/Rough-in7/11/20037/11/20037/11/2003PPASS
DetailsRuss Owen
ok to drywall. 7/11/2003 3:44:31 PM
BLD-Energy code compliance7/10/20037/10/20037/10/2003PPART
DetailsRuss Owen
VINCENT ###-#### VINCENT ###-#### Posetd c/ for fire wall continuity plans lack adequate detailing and I have went over areas with contractor trhat I have now found. Note: most problems on this job are due to inadequate plans. 7/10/2003 6:02:29 PM
BLD-Framing/Rough-in7/8/20037/8/20037/8/2003PPART
DetailsRuss Owen
###-####Ok to insulate only prior c/n neededs to be addressed which is on site at trailer. 7/9/2003 12:14:44 PM
BLD-Framing/Rough-in7/3/20037/7/20037/7/2003PFAIL
DetailsRuss Owen
###-#### vincent###-#### vincent, same c/n items to correct. 7/7/2003 6:09:37 PM###-#### vincent, same c/n items to correct. 7/7/2003 6:09:50 PM
BLD-Framing/Rough-in7/3/20037/3/20037/3/2003PFAIL
DetailsRuss Owen
###-#### vincent fire caulking###-#### vincent, fire stoping shear nailing needs to be completed. 7/7/2003 11:44:56 AM
BLD-Framing/Rough-in7/2/20037/2/20037/2/2003PFAIL
DetailsRuss Owen
###-#### vincent fire caulking 7/2/2003 5:44:29 PM, went over areas with contractor marked with paint. 7/2/2003 5:45:54 PM
BLD-Footing7/1/20037/1/20037/1/2003APART
DetailsRuss Owen
. 7/1/2003 11:38:09 AMpartial not complete,went over flue pipes thru floor, and other fire stoping and framing. 7/1/2003 5:23:20 PM 7/1/2003 5:24:01 PM
BLD-Conference6/30/20036/30/20037/1/2003PPASS
DetailsCarl Dependahl
w/ Vince...will notify if owner wants to meet re bearing columns, 1hr const... 7/1/2003 10:34:08 AM
BLD-Framing/Rough-in6/27/20036/30/20036/30/2003PCANC
DetailsRuss Owen
###-#### vincent ###-#### vincent . ou###-#### vincent . oit of time due to brt of time due to bomb threat at city hall.7/1/2003 11:38:58 AM omp 7/1/2003 11:39:01 AM 7/1/2003 11:39:29 AM
BLD-Framing/Rough-in6/26/20036/27/20036/27/2003ANR
DetailsRuss Owen
###-#### vincent
BLD-Framing/Rough-in6/27/20036/27/20036/27/2003PFAIL
DetailsRuss Owen
went over c/n items. 6/27/2003 5:19:29 PM
BLD-Framing/Rough-in6/24/20036/25/20036/25/2003PNR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 6/24/2003 at 6:06:19 PM. Contact: ###-####.Scheduled by a contractor via Hello! on 6/24/2003 at 6:01:45 PM. Contact: ###-####.this needs addnl work completed went over some items with contractor. 6/25/2003 5:21:10 PMScheduled by a contractor via Hello! on 6/24/2003 at 6:01:45 PM. Contact: ###-####.this needs addnl work completed went over some items with contractor. 6/25/2003 5:21:24 PM
BLD-Aging Inspection3/17/20033/17/20033/17/2003 CANC
DetailsRuss Owen
still working 3/17/2003 9:37:17 AM