BLD-Final | 12/10/2003 | 12/10/2003 | 12/10/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/10/2003 at 9:45:58 AM. Contact: ###-####. OK for Perm Occ. :) 12/10/2003 4:56:03 PM
|
Permanent Occupancy | | 12/10/2003 | 12/10/2003 | | DONE |
|
|
|
|
BLD-Final | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/18/2003 at 10:44:50 AM. Contact: ###-####. OK for Temp Occ. C/N...Front door to comply with ADA...per plan.....Obtain Perm Occ. within 90 days of this notice. 11/18/2003 3:30:08 PM
|
BLD-Final | 10/2/2003 | 10/3/2003 | 10/3/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/2/2003 at 11:32:48 AM. Contact: ###-####. C/N Change front door swing to meet ADA Need code inforc final Occ. 10/3/2003 2:40:21 PM
|
BLD-Final | 10/3/2003 | 10/3/2003 | 10/3/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/3/2003 at 7:23:50 AM. Contact: ###-####.
|
FIRE-Final Inspection | 10/2/2003 | 10/2/2003 | 10/2/2003 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/2/2003 at 7:30:50 AM. Contact: ###-####. will have restroom/office and playroom door hardware openable from the inside without special knowledge for structural inspection; right now the levers don't release the lock 10/2/2003 10:55:21 AM
|
Code Occupancy Approval | 10/1/2003 | 10/1/2003 | 10/1/2003 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 10/1/2003 11:58:38 AM
|
FIRE-Final Inspection | 9/26/2003 | 9/26/2003 | 9/26/2003 | P | FAIL |
Troy Cobbley
|
|
|
fire alarm system could not be finaled. I went over door hardware and fire extinguisher issues with the superintendant for the project. 9/26/2003 3:18:29 PM
|
BLD-Wall cover | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/27/2003 at 4:55:31 PM. Contact: ###-####.Adde 5/28/2003 4:49:15 PM added more screws to lid. still need gas log inspection. 5/28/2003 4:49:57 PM
|
BLD-Framing/Rough-in | 5/27/2003 | 5/27/2003 | 5/27/2003 | P | FAIL |
Russ Owen
|
|
|
vincent 1st layer dry wall cover; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Note: nothing shown on approved plans indicating drywall nailing/screwing, only indicates a double 5/8" lid, UBC , code would require screws for this assembly. Contractor is now adding screws and wil recall. 5/27/2003 5:28:00 PM
|
BLD-Framing/Rough-in | 5/22/2003 | 5/23/2003 | 5/23/2003 | A | PART |
Russ Owen
|
|
|
posted a c/n for fire place and exterior wall detail from architect. 5/27/2003 9:50:10 AM
|
BLD-Framing/Rough-in | 5/21/2003 | 5/22/2003 | 5/22/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 4:46:41 PM. Contact: ###-####.c/n. 5/22/2003 3:32:29 PM
|
BLD-Conference | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | FAIL |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Barbara MooreWaitng for detail for the ext wall 1hr construction. 5/22/2003 12:52:46 PM
|
BLD-Framing/Rough-in | 5/19/2003 | 5/20/2003 | 5/20/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/19/2003 at 5:57:10 PM. Contact: ###-####.I called contractor he needs to submit exterior wall detail assembly for 1hr construction. Same for entire project. 5/20/2003 4:59:16 PM
|
BLD-Framing/Rough-in | 5/16/2003 | 5/19/2003 | 5/19/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/16/2003 at 4:43:19 PM. Contact: ###-####.I have a c/n posted note these have been insulated with out approval. 5/19/2003 5:12:11 PM
|
BLD-Framing/Rough-in | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 5/14/2003 at 1:20:54 PM. Contact: ###-#### BOB. Fire stoping etc not done went over requirements with builder. 5/15/2003 2:48:27 PM
|
FIRE-Conference | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | DONE |
Troy Cobbley
|
|
|
vincent; Phone #: ###-#### The conference was over life safety issues in the club house. Upon inspection of the club house I found the fire alarm system being installed without approved plans. I left a stop work notice with Vincent. An email has been sent to Sam Rogers and Dave Miller 5/15/2003 1:12:34 PM
|
BLD-Conference | 5/7/2003 | 5/8/2003 | 5/8/2003 | A | PART |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Annette Moore. This construction type will rquire ifre dampers. 5/9/2003 11:21:18 AM
|
BLD-Framing/Rough-in | 4/25/2003 | 4/28/2003 | 4/28/2003 | P | FAIL |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Annette Moore Again need addnl clairification from engineer. 4/29/2003 4:32:42 PM
|
BLD-Framing/Rough-in | 4/24/2003 | 4/25/2003 | 4/25/2003 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/24/2003 at 3:02:48 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | FAIL |
Russ Owen
|
|
|
###-#### vincent ###-#### vincent . These plan are not clearly indicateing engineered features, I have again requested more clairification from engineer. Note:###-#### vincent . These plan are not clearly indicating engineered features, I have again requested more clairification from engineer. the engineer did not draw these details. 4/16/2003 4:48:41 PM
|
BLD-Conference | 4/8/2003 | 4/9/2003 | 4/9/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 4/8/2003 at 4:50:05 PM. Contact: ###-####.
|
BLD-Conference | 4/9/2003 | 4/9/2003 | 4/9/2003 | P | PART |
Russ Owen
|
|
|
would like you to meet architect at 1:30. 4/9/2003 10:04:17 AMArchitect on site went over requirements with him and contractor. If construction typ changed on town hose units will require a plan mod. 4/10/2003 10:28:51 AM
|
BLD-Conference | 3/4/2003 | 3/5/2003 | 3/5/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 3/4/2003 at 12:49:19 PM. Contact: ###-####.
|
FIRE-Conference | 3/4/2003 | 3/5/2003 | 3/5/2003 | A | DONE |
Troy Cobbley
|
|
|
Phone #: ###-#### I spoke to the contractor about on site fire protection. The last fire hydrant was being installed today. All roads accessing the job site would be finished by next week as well as all fire hydrants being operational. Building supplies are to begin arriving the end of next week 3/5/2003 9:36:54 AM
|
BLD-Framing/Rough-in | 3/3/2003 | 3/3/2003 | 3/3/2003 | P | CANC |
Russ Owen
|
|
|
###-#### vincent
|
BLD-Foundation | 1/23/2003 | 1/24/2003 | 1/24/2003 | P | PART |
Russ Owen
|
|
|
vincent; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. 1/24/2003 4:05:18 PM
|
BLD-Footing | 1/21/2003 | 1/22/2003 | 1/22/2003 | P | PART |
Russ Owen
|
|
|
801 ###-#### vincent
|