BLD-Final | 8/30/2002 | 8/30/2002 | 8/30/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/30/2002 at 09:37:43. Contact: ###-####. C. of C. #22459 issued. 8/30/2002 1:46:40 PM
|
BLD-Final | 8/30/2002 | 8/30/2002 | 8/30/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/30/2002 at 09:37:43. Contact: ###-####. C. of C. #22459 issued. 8/30/2002 1:46:40 PM
|
BLD-Framing/Rough-in | 6/28/2002 | 6/28/2002 | 6/28/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/28/2002 at 10:07:46. Contact: .--Corrections made Ok to cover 6/28/2002 3:44:02 PM
|
BLD-Framing/Rough-in | 6/27/2002 | 6/27/2002 | 6/27/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 07:18:04. Contact: ###-####. C/N ok to insulate 6/27/2002 12:08:22 PM
|
BLD-Wall cover | 6/13/2002 | 6/13/2002 | 6/13/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 07:05:57. Contact: ###-####. Ok to side 6/13/2002 10:56:41 AM
|
BLD-Wall cover | 6/12/2002 | 6/12/2002 | 6/12/2002 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/12/2002 at 06:30:55. Contact: ###-####. No approved plans 6/12/2002 1:55:10 PM
|
BLD-Foundation | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | PART |
Steven Webb
|
|
|
JARED ###-#### wip 5/23/2002 11:27:21 AM
|
BLD-Footing | 5/22/2002 | 5/22/2002 | 5/22/2002 | P | PART |
Steven Webb
|
|
|
ft insp -###-####- jerald --wip-- Rear setback to patio post is not 15 feet. Contacted builder--informed him it's ok to pour house but either a variance request is needed to P. and Z. or shorten the patio to achieve the 15' feet rear setback. 5% ready at time of inspection. 5/22/2002 1:47:16 PM
|