BLD-Final | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/18/2002 at 15:36:09. Contact: .c.c #22613 12/19/2002 11:00:10 AM
|
BLD-Wall cover | 9/10/2002 | 9/11/2002 | 9/11/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 13:46:16. Contact: . Prior c/n items not completed-do not cover. 9/11/2002 11:03:09 AM
|
BLD-Framing/Rough-in | 9/6/2002 | 9/6/2002 | 9/6/2002 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 10:10:56. Contact: . C/N posted--ok to insulate 9/6/2002 3:58:34 PM
|
BLD-Other | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 15:05:37. Contact: .
|
BLD-Other | 8/26/2002 | 8/27/2002 | 8/27/2002 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 09:04:22. Contact: . Shear-c/n posted 8/27/2002 2:02:52 PM
|
BLD-Other | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 07:48:40. Contact: . Disp set to [CANC] by a contractor via Hello! on 08/26/2002 at 09:03:25.
|
BLD-Foundation | 7/18/2002 | 7/19/2002 | 7/19/2002 | P | PART |
Steven Webb
|
|
|
MANA; Phone #: ###-#### 95% ready 7/19/2002 4:06:02 PM
|
BLD-Footing | 7/18/2002 | 7/18/2002 | 7/18/2002 | P | PART |
Steven Webb
|
|
|
mana; Phone #: ###-#### wip 7/18/2002 4:11:59 PM
|
BLD-Footing | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | FAIL |
Steven Webb
|
|
|
ft insp chris- ###-#### House was changed from the one approved by P. and Z. Setbacks appear to be a problem with the house on the lot--informed contractor to not pour and re-submit to zoning. 7/11/2002 1:14:59 PM
|
BLD-Framing/Rough-in | 7/10/2002 | 7/10/2002 | 7/10/2002 | P | CANC |
Steven Webb
|
|
|
SHEER WALL ###-#### BOB Wrong address 7/10/2002 2:32:38 PM
|