BLD-Final | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | PASS |
Russ Owen
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreok perm oc ele and plm permit numbers are on job card and have been finaled. 6/18/2003 1:42:56 PM
|
Permanent Occupancy | | 6/18/2003 | 6/18/2003 | | DONE |
|
|
|
|
BLD-Conference | 6/12/2003 | 6/12/2003 | 6/12/2003 | A | DONE |
Russ Owen
|
|
|
person named craig called me ,about the correction i left for the new rear door, appearantly he talked with architect and the architect told him how he wanted landing constructed I guess he did not like what arcitect told him , wanted to run something by me I replied do as your architect requested it is his project, I do not desing ramps only check to see that max slope would be 1/4 to foot as written. 6/12/2003 10:13:55 AM
|
BLD-Final | 6/10/2003 | 6/11/2003 | 6/11/2003 | P | PASS |
Russ Owen
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. This is ok for a temp oc, have 2 items one to remove the cabinet from hallway at rest room other to maintain 1/4 in per foot max slope at new rear eixt door. Note mechanical work done under mec 01-03226. 6/11/2003 5:19:12 PM
|
FIRE-Final Inspection | 6/9/2003 | 6/10/2003 | 6/10/2003 | A | PASS |
Troy Cobbley
|
|
|
steve; Phone #: ###-#### Fire life safety finaled. Structural to verify that the janitor closet door hardware gets changed out to approved type 6/10/2003 1:53:08 PM
|
BLD-Final | 6/5/2003 | 6/6/2003 | 6/6/2003 | P | CANC |
Russ Owen
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. needs fire life safety 6/6/2003 2:04:19 PM
|
FIRE-Final Inspection | 6/5/2003 | 6/6/2003 | 6/6/2003 | A | CANC |
Rick Jackson
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore per Troy this will be rescheduled 6/6/2003 5:10:47 PM
|
FIRE-Final Inspection | 5/29/2003 | 5/30/2003 | 5/30/2003 | A | FAIL |
Troy Cobbley
|
|
|
STEVE; Phone #: ###-#### Door hardware has not been changed and the duct smoke detectors did not shut down the hvac units 5/30/2003 9:20:30 AM
|
Code Occupancy Approval | 5/27/2003 | 5/23/2003 | 5/23/2003 | P | PASS |
Scott M.Brown
|
|
|
LOOKS OK SO FINAL SIGNED OFF. 5/27/2003 12:12:10 PM
|
BLD-Conference | 5/21/2003 | 5/21/2003 | 5/21/2003 | P | PART |
Russ Owen
|
|
|
I talked with Steve C and he is having fire life saftey and zoning out to inspect appears plumbing and ele has been approved. 5/22/2003 9:47:13 AM
|
BLD-Final | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | CANC |
Russ Owen
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Barbara MooreI talked with Steve and informed him to get all required signatures on card then I could come out as I have allready done a general walk thru with him. 5/20/2003 5:01:33 PM
|
FIRE-Final Inspection | 5/20/2003 | 5/20/2003 | 5/20/2003 | P | FAIL |
Troy Cobbley
|
|
|
install the missing canopies on the sprinkler pendants, move the foosball table that is obstructing the exit door, provide city approved fire sprinkler plans per review note #1, provide verification that a fire sprinkler monitoring system is not required, provide building address per review note #5, post sign at point of entry per review note #4, the fire extinguisher in classroom 101 is mounted too high see review note #6, provide information for cfm ratings on the hvac units for compliance with review note #30 and UMC 608, no storage allowed on the mezzanine per the scope of work comments. 5/20/2003 4:27:07 PM
|
BLD-Conference | 4/7/2003 | 4/7/2003 | 4/7/2003 | A | DONE |
Russ Owen
|
|
|
Meet on site with George Slain and Steve Carlson. The building has no CO. The tenants have been given both a 5 day notice on 1/24/03 and 25 day on 2/3/03. Now we have instructed them to submit to the director a letter of intent for all violations on property, also to check with the plan review dept and related office personel for any questions that they may have. 4/7/2003 11:29:31 AM
|
BLD-Framing/Rough-in | 7/8/2002 | 7/9/2002 | 7/9/2002 | A | PART |
Russ Owen
|
|
|
CRYUS ###-####. ok to cover. ceiling fans above restrooms have been connected ok.S7/9/2002 12:03:41 PM 7/9/2002 12:04:08 PM
|
BLD-Framing/Rough-in | 7/3/2002 | 7/8/2002 | 7/8/2002 | A | FAIL |
Russ Owen
|
|
|
STEVE ###-#### // CELL # ###-####c/n posted also needs electrical and mechanical approved. 7/8/2002 5:22:21 PM
|
BLD-Framing/Rough-in | 7/2/2002 | 7/3/2002 | 7/3/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### steve . No plans at the site left ac/n posted to provide plans alsocalled this number no answer. 7/3/2002 10:50:45 AM
|