Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01157
StatusFinaled
Name SILVER LAKE APARTMENTS
Site Address 3323 N LAKEHARBOR LN
Project NameSILVER LAKE APARTMENTS
Customer Number 
ePlanReviewNo
Description
(Building B) - To construct a new 16,416 sq.ft. three story, wood framed, 18 unit apartment building. The first floor is 7,506 sq.ft. and the second floor is 7,080 sq.ft. and the third floor is 1,830 sq.ft. NOTE: This building is fire sprinklered per NFPA 13-R. All construction per the approved plans and attached comment list. PC #310-02 DRH01-00233 SS CUP01-00159 DAA
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/24/20046/25/20046/25/2004PPASS
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ok for perm c of o 6/25/2004 1:45:15 PM
FIRE-Final Inspection6/25/20046/25/20046/25/2004APASS
DetailsRick Jackson
Permanent Occupancy 6/25/20046/25/2004 DONE
Details
BLD-Final6/2/20046/3/20046/3/2004PNR
DetailsTony Young
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
need fire sign-offs 1st 6/3/2004 4:29:43 PM
FIRE-Final Inspection6/2/20046/3/20046/3/2004APASS
DetailsRick Jackson
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes All items for life safety okay; awaiting alarm sprinkler monitoring 6/3/2004 10:48:10 AM
FIRE-Final Inspection5/26/20045/27/20045/27/2004PFAIL
DetailsTroy Cobbley
No actual inspections were done. At the start of the fire sprinkler inspection I found that a different backflow preventor has been installed. Verification of friction loss is needed. Need NFPA 25. Provide verification that exposed cpvc sprinkler piping in the riser room is ok. Also per inspector 409 the fire sprinkler plans need to be resubmitted which has not been done yet according to the history available on the computer. Fire alarm plans need to be resubmitted due to changes in zones and notification circuitry. 5/27/2004 3:34:05 PM
BLD-Final5/24/20045/26/20045/26/2004ANR
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
FIRE-Final Inspection5/24/20045/25/20045/25/2004PCANC
DetailsTroy Cobbley
bob; Phone #: ###-#### Bob stated that the fire alarm contractor was not finished yet 5/25/2004 4:39:56 PM
Code Occupancy Approval5/5/20045/5/20045/5/2004APASS
DetailsWm. Michael Meloy
Compliance met. 5/5/2004 11:54:08 AM
BLD-Conference4/28/20044/29/20044/29/2004APART
DetailsTony Young
see Bob Erland about aging
just about there 4/29/2004 12:37:17 PM
BLD-Aging Inspection4/28/20044/28/20044/28/2004 PASS
DetailsTony Young
BLD-Aging Inspection1/27/20041/27/20041/27/2004 PASS
DetailsTony Young
BLD-Conference10/21/200310/22/200310/22/2003ACANC
DetailsTony Young
BOB
BLD-Conference10/22/200310/22/200310/22/2003PPART
DetailsTony Young
apartments, bob earland
will need car port permits when ready 10/23/2003 10:15:06 AM
BLD-Conference10/17/200310/17/200310/17/2003PPASS
DetailsTony Young
see bob earland
ok to keep going 10/20/2003 9:42:52 AM
BLD-Aging Inspection10/16/200310/16/200310/16/2003 CANC
DetailsTony Young
BLD-Energy code compliance8/11/20038/12/20038/12/2003APASS
DetailsTony Young
###-#### bob
BLD-Framing/Rough-in8/5/20038/6/20038/6/2003PPASS
DetailsTony Young
BOB; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Conference5/2/20035/5/20035/5/2003APART
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
need to follow plans 5/5/2003 4:36:35 PM
BLD-Conference5/5/20035/5/20035/5/2003PPASS
DetailsTony Young
w/ engineer on fire assbly
follow plans 5/5/2003 4:44:16 PM
BLD-Framing/Rough-in4/22/20034/22/20034/22/2003PPART
DetailsTony Young
rocky shear nail; Phone #: ###-#### Internet Inspection Request from: Darla Downs
exterior shear ok 4/22/2003 4:43:46 PM
BLD-Conference2/28/20033/3/20033/3/2003APART
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
conf. on paperwork, also need to check on 1 hour fire doors vs. 20 min. ,, changes in shear,, ok w/ new engineering 3/3/2003 11:24:14 AM
BLD-Foundation2/26/20032/26/20032/26/2003PPART
DetailsTony Young
manuel ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing2/25/20032/25/20032/25/2003PPASS
DetailsDave Hannah
###-####