Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01256
StatusFinaled
Name ST ALPHONSUS REG MED CEN INC
Site Address 1055 N CURTIS RD
Project NameST ALS-N TOWER
Customer Number 
ePlanReviewNo
Description
(ST ALPHONSUS-NORTH TOWER-2ND FLR)(PHARMACY) To remodel an existing office area of 3,962 sq.ft. located on the 2nd floor north tower for use as a 'pharmacy administration, receiving, breakdown, distribution & storage area for service to the overall hospital facility per approved plans on file. Work includes selective demolition and new construction of interior non-bearing, non-combustible, fire-resistive walls to create accessible restroom, conference room and work areas; install movable work station furniture; upgrade per clients needs and to meet minimum codes the electrical, plumbing, mechanical, fire-supression & alarm system; and support facilities. NOTE: A certificate of occupancy is required for this tenant. This building is fully sprinklered. PC#02-334/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/1/200211/4/200211/4/2002PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/01/2002 at 10:33:33. Contact: ###-####. ok for perm 11/4/2002 12:54:09 PM
Permanent Occupancy 11/4/200211/4/2002 DONE
Details
BLD-Conference10/29/200210/30/200210/30/2002ADONE
DetailsTom Arcoraci
done by 340 ok for temp occ 10/30/2002 1:22:46 PM
BLD-Conference10/29/200210/30/200210/30/2002APASS
DetailsCarl Dependahl
w/ mark at site re glazing req's 10/30/02 11:03:48 AM
BLD-Final10/30/200210/30/200210/30/2002AFAIL
DetailsCarl Dependahl
need verify 45 min. glass at door 20234a
BLD-Final10/29/200210/29/200210/29/2002PCANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/29/2002 at 08:50:21. Contact: ###-####....reschedule. 10/29/02 4:58:25 PM
FIRE-Final Inspection10/28/200210/29/200210/29/2002APASS
DetailsTroy Cobbley
fire life/safety and fire sprinklers finaled 10/29/2002 8:47:41 AM
FIRE-Final Inspection10/17/200210/17/200210/17/2002PPART
DetailsTroy Cobbley
temporary occupancy was given on the life/safety due to the temp on the fire sprinkler. All items for the life/safety inspection are ok and can be finaled when the fire sprinklers are finaled 10/17/2002 3:41:47 PM
FIRE-Final Inspection10/9/200210/11/200210/11/2002AFAIL
DetailsTroy Cobbley
provide approved door hardware for the restroom and cubicle . Turn exit sign at the east exit 10/11/2002 10:26:35 AM 10/11/2002 10:27:01 AM
BLD-Conference10/9/200210/10/200210/10/2002APASS
DetailsTom Arcoraci
###-#### mark needs s rated doors 10/10/2002 10:27:01 AM
BLD-Conference10/9/200210/10/200210/10/2002APASS
DetailsTom Arcoraci
###-#### mark needs s rated doors 10/10/2002 10:26:05 AM
FIRE-Final Inspection9/27/20029/30/20029/30/2002PCANC
DetailsTroy Cobbley
contractor told me to cancel the inspection since I can't sign off the fire/life safety without the the fire alarm being done 9/30/2002 3:16:39 PM
BLD-Wall cover9/3/20029/4/20029/4/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/03/2002 at 16:34:00. Contact: ###-####...efis covered; add, wires & pods at grid....some missed, walls ok. 9/4/2002 6:19:09 PM
BLD-Other9/3/20029/3/20029/3/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/03/2002 at 08:26:32. Contact: ###-####.
BLD-Other8/16/20028/19/20028/19/2002APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/16/2002 at 09:50:51. Contact: ###-####.incapsulate efis foam exposed above ceilling/ seal top of wall at smoke bairror/ ada restaroom fire wall ok for cover. 8/19/2002 9:53:10 AM
BLD-Framing/Rough-in8/13/20028/13/20028/13/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/13/2002 at 10:30:06. Contact: ###-####.non bearing walls have been drywall w-o insp appears ok they will need to call for a re-inspection of fire walls above ceiling before tile. 8/13/2002 4:41:57 PM