BLD-Final | 11/20/2002 | 11/21/2002 | 11/21/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####...lc issued, has $4000 bond for possible variance for "overheight "retaining wall at front set-back... 11/21/02 4:02:03 PM
|
BLD-Grading Inspection | 11/21/2002 | 11/21/2002 | 11/21/2002 | | BOND |
Rita DeYoung
|
|
|
Final grading is complete and approved except for the retaining wall along the driveway. It was not built as approved and requires a variance. The contractor has submitted a $4000.00 bond to rebuild the wallas approved. Grading and drainage is conditionally approved.
|
BLD-Conference | 11/12/2002 | 11/15/2002 | 11/15/2002 | A | CANC |
Carl Dependahl
|
|
|
FRANK IHIS IS TO MAKE SURE THAT RVERY THING IS OK BEFORE A FINAL IS CALLED FOR; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Final | 11/14/2002 | 11/14/2002 | 11/14/2002 | A | FAIL |
Carl Dependahl
|
|
|
c/n, handrails, insul & air seal...other finals, misc finish, carpet, woodstovenot finalled, courtesy inspection only.
|
BLD-Foundation | 11/13/2002 | 11/14/2002 | 11/14/2002 | A | PART |
Carl Dependahl
|
|
|
###-####...ret wall by drive ok 11/14/02 12:40:20 PM
|
BLD-Footing | 11/13/2002 | 11/13/2002 | 11/13/2002 | P | PART |
Steven Webb
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip--90% ready--retaining wall footing--per engineering. 11/13/2002 3:37:53 PM
|
BLD-Energy code compliance | 10/17/2002 | 10/18/2002 | 10/18/2002 | A | PART |
Carl Dependahl
|
|
|
ok to cover, need r-10 at bsmt concrete walls 10/18/02 5:00:34 PM
|
BLD-Energy code compliance | 10/15/2002 | 10/17/2002 | 10/17/2002 | P | CANC |
Jim Storey
|
|
|
FRANK; Phone #: ###-#### Internet Inspection Request from: Darla Downs out of time. 10/17/2002 5:25:10 PM
|
BLD-Framing/Rough-in | 10/14/2002 | 10/15/2002 | 10/15/2002 | P | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 10/7/2002 | 10/8/2002 | 10/8/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/07/2002 at 19:12:49. Contact: ###-####.ext. shear ok, pending eng. letter 10/8/2002 12:07:02 PM
|
BLD-Framing/Rough-in | 10/4/2002 | 10/7/2002 | 10/7/2002 | A | FAIL |
Tony Young
|
|
|
frank shear wall; Phone #: ###-#### Internet Inspection Request from: Darla Downs
c/n posted 10/7/2002 11:15:00 AM
|
BLD-Foundation | 8/30/2002 | 9/3/2002 | 9/3/2002 | A | PART |
Tony Young
|
|
|
wip, ok to pour when ready 9/3/2002 11:50:01 AM
|
BLD-Foundation | 8/29/2002 | 8/30/2002 | 8/30/2002 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
wip 9/3/2002 11:36:08 AM
|
BLD-Footing | 8/22/2002 | 8/23/2002 | 8/23/2002 | A | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Foundation | 8/23/2002 | 8/23/2002 | 8/23/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/23/2002 at 10:00:38. Contact: ###-####.
|
BLD-Grading Inspection | 8/13/2002 | 8/13/2002 | 8/13/2002 | | DONE |
Rita DeYoung
|
|
|
footing subgrade has been approved by the geotechnical engineer
|