BLD-Final | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | PASS |
Russ Owen
|
|
|
###-#### or ###-#### jack ok perm oc. 2/14/2003 5:03:02 PM
|
Permanent Occupancy | | 2/14/2003 | 2/14/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled
|
Code Occupancy Approval | 2/12/2003 | 2/12/2003 | 2/12/2003 | A | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED 2/13/2003 1:02:35 PM
|
FIRE-Final Inspection | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | FAIL |
Troy Cobbley
|
|
|
fire life safety items ok but can not final until the fire alarm is finaled 2/12/2003 12:19:02 PM
|
BLD-Final | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 2/6/2003 at 2:40:29 PM. Needs 2/7/2003 9:32:02 AM called fire/life safety inspector and found out that this has not been finaled by him and there is no contact number and I am at the site but do not know who to contact also could need other finals. 2/7/2003 9:34:33 AM
|
FIRE-Final Inspection | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | CANC |
Troy Cobbley
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/22/2002 | 11/25/2002 | 11/25/2002 | A | PART |
Tom Arcoraci
|
|
|
left over from friday. needs spec insp for bolting 11/25/2002 8:59:02 AM
|
BLD-Framing/Rough-in | 11/22/2002 | 11/22/2002 | 11/22/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/22/2002 at 10:09:09. Contact: ###-####.recalled for monday out of time. 11/22/2002 4:47:50 PM
|
BLD-Foundation | 10/4/2002 | 10/4/2002 | 10/4/2002 | P | PASS |
Dave Hannah
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Footing | 10/3/2002 | 10/3/2002 | 10/3/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/03/2002 at 10:44:16. Contact: ###-####.
|