Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01413
StatusFinaled
Name BOISE CITY ADMINISTRATIVE OFFICES
Site Address 150 N CAPITOL BLVD
Project NameCITY HALL EXPANSION-1ST FLR
Customer Number 
ePlanReviewNo
Description
(BOISE CITY ADMINISTRATIVE OFFICES)(CITY HALL EXPANSION-1st FLOOR) (ARTS COMMISSION, DFM & UTILITY BILLING) To perform selective demolition of entire 1st floor. To remodel a 12,812 sq. ft. area for use as offices and support areas. To construct interior, non-bearing, non-combustible, fire-resistive walls to create offices, wprk rooms, conference rooms, training room & break room; to upgrade restrooms for accessibility compliance; new suspended grid ceiling system; upgrade mechanical, electrical, plumbing, fire sprinkler and alarm systems to meet tenant needs and comply with current adopted Boise City codes. All per approved plans, to include red-line notes & attached plan reviews. NOTE: The entire building is fire sprinklered. A Certificate of Occupancy is required. PC#02-372/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/29/20095/29/20095/29/2009PPASS
DetailsBob Archibald
Fire alarm and sprinker requirements completed. FIR02-00515 & 00451
BLD-Aging Inspection3/1/20043/1/20043/1/2004 DONE
DetailsDave Hannah
BLD-Conference7/22/20037/22/20037/22/2003PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 7/22/2003 at 11:10:16 AM. Contact: ###-####.w/ arch at site: need dampers at bsmt occupancy separation as per c/n. 7/22/2003 3:18:19 PM
BLD-Conference6/2/20036/4/20036/4/2003PCANC
DetailsCarl Dependahl
BLD-Final5/30/20036/2/20036/2/2003APART
DetailsCarl Dependahl
###-####
BLD-Final3/20/20033/20/20033/20/2003APART
DetailsGeorge Slane
ok for temp. occ.
FIRE-Final Inspection3/20/20033/20/20033/20/2003PPART
DetailsRick Jackson
temp occ aprroved per agreementletter to interconnect standpipes and monitor tampers in basement
BLD-Final3/14/20033/17/20033/17/2003AFAIL
DetailsCarl Dependahl
###-####; keep c/n....arch to clarify occupancy separation...(s/f dampers, elevator lobby at bsmt?) 3/17/2003 1:19:36 PM
FIRE-Final Inspection3/14/20033/17/20033/17/2003AFAIL
DetailsRick Jackson
###-#### ###-#### need alternate floor elevator recall; monitor all tampers; sprinkler all areas; interconnect all standpipes; install alarm notification in all walkways and lobbies; need alarm notification on second floor open office area; 3/17/2003 10:45:49 AM
BLD-Final3/13/20033/14/20033/14/2003ANR
DetailsCarl Dependahl
###-####...keep c/n (fire final...?)
3/14/2003 5:04:02 PM
BLD-Final3/13/20033/14/20033/14/2003ANR
DetailsCarl Dependahl
###-####...keep c/n re fire; struct. issues ok 3/17/2003 1:14:09 PM
FIRE-Final Inspection3/13/20033/14/20033/14/2003ACANC
DetailsRick Jackson
###-####
BLD-Final3/6/20033/7/20033/7/2003AFAIL
DetailsCarl Dependahl
###-####...c/n obtain fire, complete misc items, post occ load at training rm; egress/access controll devices (OFOI) to be approved (N.I.C?) 3/7/2003 3:42:02 PM
BLD-Final3/5/20033/6/20033/6/2003ANR
DetailsCarl Dependahl
###-####...no insp, need fire ok, etc. 3/6/2003 3:48:19 PM
FIRE-Final Inspection3/5/20033/6/20033/6/2003AFAIL
DetailsRick Jackson
###-#### need timeline for fixing standpipe interconnection and sprinklering all areas; remove head in east comm room; need standard response sprinklers on second floor as QR's were installed; need max occupant load sign in training room 3/6/2003 1:02:30 PM
BLD-Conference2/11/20032/11/20032/11/2003PPASS
DetailsCarl Dependahl
scott...re T/O....need all trade ok's 2/11/2003 2:40:43 PM
BLD-Conference1/30/20031/31/20031/31/2003PPASS
DetailsCarl Dependahl
grid reinsp...ok, braces added 1/31/2003 3:32:32 PM
BLD-Framing/Rough-in1/29/20031/30/20031/30/2003ANR
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...need elec ok'd; add braces at t.o.w. ...some missed; chk spreaders at final 1/30/2003 1:51:18 PM
BLD-Framing/Rough-in1/30/20031/30/20031/30/2003PPART
DetailsCarl Dependahl
###-####
BLD-Framing/Rough-in1/30/20031/30/20031/30/2003PCANC
DetailsCarl Dependahl
grid reinsp.
BLD-Framing/Rough-in12/19/200212/20/200212/20/2002APART
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung; int partitions,floor penetrations, ok ; verbal for arch to investigate hvac penetrations at east stair enclosure. 12/20/2002 1:06:02 PM
BLD-Framing/Rough-in12/10/200212/11/200212/11/2002ANR
DetailsCarl Dependahl
###-####
BLD-Framing/Rough-in12/11/200212/11/200212/11/2002PPART
DetailsCarl Dependahl
8694101 scott...SEAL PLBG FL. PENETRATIONS...OK TO 1 SIDE. NEED FIRE SPRINKLER INSP. PRIOR TO CEILING COVER; HAS HVAC PENETRATION AT EAST STAIR ENCLOSURE... 12/11/2002 3:56:18 PM
BLD-Conference11/5/200211/6/200211/6/2002ADONE
DetailsTom Arcoraci
Scott cn issued by 340 11/6/2002 8:46:29 AM 11/6/2002 8:47:15 AM