Permanent Occupancy | | 2/19/2003 | 2/19/2003 | | DONE |
|
|
|
|
BLD-Final | 12/10/2002 | 12/11/2002 | 12/11/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/10/2002 at 17:26:47. Contact: ###-####.temp oc ok pending all req signatures for a perm. 12/11/2002 6:30:37 PM
|
BLD-Final | 12/10/2002 | 12/11/2002 | 12/11/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/10/2002 at 17:26:47. Contact: ###-####.temp oc ok pending all req signatures for a perm. 12/11/2002 6:30:37 PM
|
FIRE-Final Inspection | 12/11/2002 | 12/11/2002 | 12/11/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 12/11/2002 2:11:05 PM
|
BLD-Final | 12/10/2002 | 12/10/2002 | 12/10/2002 | P | NR |
Russ Owen
|
|
|
###-#### dave This needs all required signatures on card prior to calling for a final. 12/10/2002 1:50:50 PM
|
FIRE-Final Inspection | 12/10/2002 | 12/10/2002 | 12/10/2002 | P | FAIL |
Troy Cobbley
|
|
|
three emergency lights and two duct detectors do not work. Still need air balance reports 12/10/2002 3:39:14 PM
|
BLD-Conference | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | PART |
Russ Owen
|
|
|
adding fire blanket to top of hood 12/9/2002 4:36:19 PM
|
Code Occupancy Approval Temp | 12/10/2002 | 12/9/2002 | 12/9/2002 | A | DONE |
Scott M.Brown
|
|
|
BOND POSTED FOR LANDSCAPE IN THE AMOUNT OF $2500.00, TEMP OCCUPANCY SIGNED OFF. 12/10/2002 11:16:26 AM
|
BLD-Framing/Rough-in | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | PART |
Russ Owen
|
|
|
grid insp --dave ###-####
|
FIRE-Final Inspection | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | FAIL |
Troy Cobbley
|
|
|
fire suppression test . The lights under the hood need to shut off when the fire suppression system activates
|
BLD-Conference | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | PART |
Russ Owen
|
|
|
conference on kitchen hood. 12/4/2002 5:55:23 PM Posted a c/n for grease hood. 12/5/2002 1:37:57 PM
|
BLD-Conference | 12/4/2002 | 12/4/2002 | 12/4/2002 | P | CANC |
Russ Owen
|
|
|
###-#### called contractor will meet am. 12/4/2002 5:54:59 PM
|
BLD-Framing/Rough-in | 11/18/2002 | 11/19/2002 | 11/19/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/18/2002 at 13:20:45. Contact: ###-####.ok subject to other inspectors electrical, plumbing. framing completed. 11/19/2002 12:29:35 PM
|
BLD-Conference | 11/12/2002 | 11/12/2002 | 11/12/2002 | P | PART |
Russ Owen
|
|
|
will be useing duct wrap at 1 hr shaft. 11/12/2002 2:55:50 PM
|
BLD-Framing/Rough-in | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/07/2002 at 13:07:56. Contact: ###-####.engineer approved retro fit anchor bols at plate breaks . 11/8/2002 10:47:45 AM
|
BLD-Framing/Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 | A | PART |
Russ Owen
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieneeds ancho 11/7/2002 12:30:06 PM exterior walls only needs anchor bolts at plate breaks. notified contractor on site,to check with engineer. 11/7/2002 12:41:35 PM
|
BLD-Framing/Rough-in | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | PART |
Russ Owen
|
|
|
ok to side. 10/30/2002 5:24:25 PM
|
BLD-Framing/Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 | P | PART |
Russ Owen
|
|
|
###-####still makeing rwepairs. 10/29/2002 2:27:52 PM
|
BLD-Framing/Rough-in | 10/25/2002 | 10/28/2002 | 10/28/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### dave c/n pon site. 10/28/2002 2:13:04 PM
|
BLD-Framing/Rough-in | 10/22/2002 | 10/23/2002 | 10/23/2002 | A | FAIL |
Russ Owen
|
|
|
###-####. posted c/n. 10/23/2002 4:18:19 PM
|
BLD-Framing/Rough-in | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | PART |
Tom Arcoraci
|
|
|
roof load; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung roof ok for cover 10/22/2002 4:38:53 PM
|
BLD-Framing/Rough-in | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | PART |
Tom Arcoraci
|
|
|
roof load; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung roof ok for cover 10/22/2002 4:38:53 PM
|
BLD-Foundation | 9/23/2002 | 9/24/2002 | 9/24/2002 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 9/19/2002 | 9/20/2002 | 9/20/2002 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Concrete | 9/18/2002 | 9/19/2002 | 9/19/2002 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung rebar not finished about 10% crew will re schedule for tomorrow am 9/19/2002 1:08:38 PM
|