Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01471
StatusExpired
Name DOUG LASHER CONSTRUCTION
Site Address 4953 N ARROW CREST WAY
Project NameHILLSIDE
Customer Number 
ePlanReviewNo
Description
To construct a 3189 sq. ft. two story single family dwelling with a 902 sq. ft. finished basement, a 960 sq. ft. attached three car garage, a 84 sq. ft. covered entry way and a 262 sq. ft. covered concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area are required. (1st floor 2630 sq. ft.)(2nd floor 559 sq. ft.) PC #402 CUP #44-94 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/9/200310/9/200310/9/2003PPASS
DetailsTony Young
BRYAN ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
l of c issued 10/9/2003 2:43:08 PM
BLD-Energy code compliance9/10/20039/11/20039/11/2003ACANC
DetailsTony Young
ALAN; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD-Energy code compliance9/11/20039/11/20039/11/2003PCANC
DetailsTony Young
BLD-Final9/11/20039/11/20039/11/2003PCANC
DetailsTony Young
alan ###-####
wrong permit # 9/11/2003 3:17:02 PM
BLD-Grading Inspection7/10/20037/10/20037/10/2003 PASS
DetailsRita DeYoung
Final grading and drainage is approved
BLD-Framing/Rough-in12/20/200212/23/200212/23/2002PPASS
DetailsSteven Webb
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Interior shear 12/23/2002 3:43:00 PM
BLD-Energy code compliance12/5/200212/6/200212/6/2002APASS
DetailsTony Young
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance12/4/200212/5/200212/5/2002AFAIL
DetailsTony Young
###-#### bryan
not ready 12/5/2002 10:06:32 AM
BLD-Framing/Rough-in12/3/200212/4/200212/4/2002APART
DetailsTony Young
c/n posted, ok to insulate 12/4/2002 10:14:43 AM
BLD-Framing/Rough-in12/2/200212/3/200212/3/2002AFAIL
DetailsTony Young
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
not ready 12/3/2002 11:32:10 AM
BLD-Framing/Rough-in12/3/200212/3/200212/3/2002PNR
DetailsTony Young
BLD-Framing/Rough-in11/22/200211/25/200211/25/2002AFAIL
DetailsTony Young
###-####
c/n posted 11/25/2002 11:15:16 AM
BLD-Footing9/19/20029/20/20029/20/2002ANR
DetailsTony Young
###-#### TIM
BLD-Footing9/20/20029/20/20029/20/2002PPART
DetailsTony Young
TIM ###-####
pending soil report 9/20/2002 4:02:21 PM
BLD-Foundation9/10/20029/10/20029/10/2002PPART
DetailsTony Young
found wall- eric- ###-####
wip 9/10/2002 3:25:26 PM
BLD-Footing8/30/20029/3/20029/3/2002APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/30/2002 at 12:39:45. Contact: ###-####.ok pending soil test 9/3/2002 11:42:32 AM
BLD-Grading Inspection9/3/20029/3/20029/3/2002 DONE
DetailsRita DeYoung
Geotech engineer has approved footing subgrade.