BLD-Final | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | PASS |
Jim Storey
|
|
|
KELLY ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 11/21/2002 | 11/21/2002 | 11/21/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### exterior gaurdrailling min 36 inches/handrail exterior stair nose to nose/min r-19 at basement rim joist. 11/21/2002 1:23:09 PM
|
BLD-Energy code compliance | 9/17/2002 | 9/18/2002 | 9/18/2002 | A | PASS |
Steven Webb
|
|
|
KELLY ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 9/16/2002 | 9/17/2002 | 9/17/2002 | A | PASS |
Steven Webb
|
|
|
fr insp j jones ###-#### Shear and frame--ok to side and insulate. 9/17/2002 10:15:16 AM
|
BLD-Framing/Rough-in | 9/13/2002 | 9/16/2002 | 9/16/2002 | A | FAIL |
Steven Webb
|
|
|
###-#### C/N issued. 9/16/2002 11:57:47 AM
|
BLD-Framing/Rough-in | 9/13/2002 | 9/16/2002 | 9/16/2002 | A | FAIL |
Steven Webb
|
|
|
###-#### C/N issued. 9/16/2002 11:49:54 AM
|
BLD-Framing/Rough-in | 9/11/2002 | 9/12/2002 | 9/12/2002 | P | FAIL |
Dave Hannah
|
|
|
###-####c/n on site 9/12/2002 2:08:12 PM
|
BLD-Foundation | 8/1/2002 | 8/1/2002 | 8/1/2002 | P | PART |
Steven Webb
|
|
|
; Phone #: ###-#### wip--Rebar in place--70% ready. 8/1/2002 2:42:28 PM
|
BLD-Footing | 7/30/2002 | 7/30/2002 | 7/30/2002 | P | PART |
Steven Webb
|
|
|
###-#### wip--75% ready 7/30/2002 4:36:05 PM
|
BLD-Foundation | 7/18/2002 | 7/18/2002 | 7/18/2002 | P | PART |
Steven Webb
|
|
|
DARREN; Phone #: ###-#### wip--95% ready--rebar per plans--hd not installed at time of inspection. 7/18/2002 3:25:52 PM
|
BLD-Footing | 7/15/2002 | 7/16/2002 | 7/16/2002 | P | PART |
Steven Webb
|
|
|
###-#### wip--85% ready 7/16/2002 4:07:48 PM
|