BLD-Aging Inspection | 11/21/2005 | 11/21/2005 | 11/21/2005 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/19/2005 | 9/19/2005 | 9/19/2005 | | CANC |
Tom Arcoraci
|
|
|
|
BLD-Final | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | PASS |
Tom Arcoraci
|
|
|
code zone issues Internet Inspection Request from: Barbara Moore ok for perm occ
|
DOC - Permit Expired | 6/7/2005 | 6/7/2005 | 6/7/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
Code Occupancy Approval | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | DONE |
Bob Archibald
|
|
|
SCOTT BROWN FINAL SIGNED OFF
|
BLD-Aging Inspection | 4/28/2005 | 4/28/2005 | 4/28/2005 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Final | 12/29/2004 | 12/30/2004 | 12/30/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/29/2004 at 3:04:25 PM. Contact: ###-####.
|
FIRE-Final Inspection | 12/29/2004 | 12/30/2004 | 12/30/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 12/30/2004 12:10:41 PM
|
FIRE-Final Inspection | 12/29/2004 | 12/30/2004 | 12/30/2004 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 12/29/2004 at 3:03:25 PM. Contact: ###-####.
|
BLD-Final | 12/23/2004 | 12/28/2004 | 12/28/2004 | A | CANC |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/23/2004 at 4:19:30 PM. Contact: ###-####.
had conf. w/ owner regarding necessary items for final 12/28/2004 11:25:32 AM
|
FIRE-Final Inspection | 12/27/2004 | 12/27/2004 | 12/27/2004 | P | FAIL |
Troy Cobbley
|
|
|
Still need waterflow verification from United Water 12/27/2004 2:02:11 PM
|
FIRE-Final Inspection | 12/23/2004 | 12/27/2004 | 12/27/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification of 2000 gpm from united water at hydrant and provide approved door hardware 12/27/2004 9:38:41 AM
|
BLD-Final | 12/17/2004 | 12/22/2004 | 12/22/2004 | A | CANC |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/17/2004 at 1:58:34 PM. Contact: ###-####.
to reschedule after fire insp. approval 12/22/2004 11:21:37 AM
|
FIRE-Final Inspection | 12/17/2004 | 12/20/2004 | 12/20/2004 | A | FAIL |
Troy Cobbley
|
|
|
Per fire dept review note #3 a fire hydrant is shown on sheet #1. That sheet is missing from the plans. Provide the missing sheet for hydrant verification. Provide waterflow verification per review note #4. Targee street must be open for fire dept access. See review note #5. Provide building address per review note #8. Provide ada approved door hardware on all doors per review note #10. Thumbturns are not allowed. Provide annual inspection for all fire extinguishers. See review note #9 12/20/2004 10:21:15 AM
|
BLD-Final | 12/9/2004 | 12/10/2004 | 12/10/2004 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/9/2004 at 1:56:38 PM. needs fire approval and othres 12/10/2004 8:45:48 AM 12/10/2004 8:46:21 AM
|
FIRE-Final Inspection | 12/9/2004 | 12/10/2004 | 12/10/2004 | P | FAIL |
Troy Cobbley
|
|
|
No approved plans on site. I told the owner per the small amount of information I could access on this project it is a requirement for the shop area, H-4 occupancy, to be sprinklered. At this time there are no sprinklers installed. 12/10/2004 4:04:44 PM
|
BLD-Final | 12/8/2004 | 12/9/2004 | 12/9/2004 | P | NR |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 11:01:50 AM. Contact: ###-####.
needs fire and zoning approval prior to bldg 12/9/2004 2:40:56 PM
|
BLD-Wall cover | 5/6/2004 | 5/7/2004 | 5/7/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/6/2004 at 5:25:54 PM. Contact: ###-####. drywall nailer instsalled 5/7/2004 9:45:42 AM
|
BLD-Wall cover | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PART |
Russ Owen
|
|
|
###-#### mike. posted c/n , but ok to insulate and hang ceiling and walls only need to look at fire wall contractor on site will comply with c/n and call back for inspection. 4/29/2004 5:54:43 PM
|
BLD-Conference | 7/10/2003 | 7/10/2003 | 7/10/2003 | A | FAIL |
Russ Owen
|
|
|
This has been insulated with out approval at last inspection I had left a c/n posted wit a framing do not cover sticker both of which have been removed, now I have posted a stop work order along with another do not cover sticker and taped a buiseness card up also. Todays inspection was not phoned in I am here for a mechanical r-i. 7/10/2003 1:19:44 PM
|
BLD-Framing/Rough-in | 6/13/2003 | 6/13/2003 | 6/13/2003 | P | FAIL |
Russ Owen
|
|
|
###-####. I have spoke with the engineer he said he had been out to advise them again, and had giver them letter for repairs. I see no letter on site and no special inspection report for any anchor bolt /hold downs, no approved plans, so I have posted a do not cover sticker. on window also with correction about the above. 6/13/2003 4:58:40 PM
|
BLD-Conference | 2/24/2003 | 2/25/2003 | 2/25/2003 | P | PART |
Russ Owen
|
|
|
randy; Phone #: ###-#### need to meet at 4:00 pm.Internet Inspection Request from: Marsha Smylie 2/24/2003 3:25:23 PM. Meet with Engineer,Owner,Framer and Tenant. T o go over the building structure, It was noted that the moved building will have several as built changes to the wall construction. And the structural issues were explained by myself and engineer to the parties pressent. 2/26/2003 1:47:59 PM
|
BLD-Conference | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | CANC |
Russ Owen
|
|
|
this is for 2/25 2/24/2003 2:21:53 PM
|
BLD-Conference | 2/21/2003 | 2/24/2003 | 2/24/2003 | P | CANC |
Carl Dependahl
|
|
|
reschedule... 2/24/2003 1:54:08 PM
|
BLD-Conference | 2/21/2003 | 2/21/2003 | 2/21/2003 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 2/20/2003 | 2/21/2003 | 2/21/2003 | P | FAIL |
Russ Owen
|
|
|
randy or ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. I meet on site with Randy who will be the occupant, I went over several items with him in reguard to structural issues, there is not 1 hold down that has been installed right, I see by a "note" on the plans that interior shear will be used, there are no cross sections. Connections to the bottom sole plate in some areas will not be able to receive nailing, some areas need full length studs, Note it would appear that a large window has been added at the peak of the north end this is not shown on plan.The exterior wall framing has not been completed to receive the metal siding as the exterior wall framing was changed to smaller diminsion studs and there are areas which will need furing, These plans lack neccesary detailing. As is now there is only the north side of the schell on site, I have been informed by the person on site that there will also be interior changes. I told person on site this day that I would need to meet back on site with my suppervisor and framer also enginner , so as to have all parties present to go over the extensive corrections and or changes,that will need to be made to bring this structure into compliance at least at the structural exterior areas. NOTE: I have been informed that there will be interior changes made to the floor plan at this time I do not know as to the extent. 2/23/2003 10:01:35 AM
|
BLD-Framing/Rough-in | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | FAIL |
Russ Owen
|
|
|
###-#### LARRY > 407 and 408 went to job site meet owner and gave him a c/n plans lack details and anchors bols not installed need engineer to feild address, not not side or cover anything. 2/12/2003 10:41:24 AM
|
BLD-Conference | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | DONE |
Tom Arcoraci
|
|
|
randy-- cell ###-#### or off ###-#### - done by 407 1/31/2003 2:28:40 PM
|
BLD-Foundation | 11/26/2002 | 11/26/2002 | 11/26/2002 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
|
BLD-Footing | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | PASS |
Steven Webb
|
|
|
###-####
|