BLD-Final | 5/29/2009 | 5/29/2009 | 5/29/2009 | P | PASS |
Bob Archibald
|
|
|
Ok for final. Fire requirements completed under FIR02-00515 and 00451.
|
BLD-Aging Inspection | 5/29/2008 | 5/29/2008 | 6/6/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Expired | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/4/2008 | 3/4/2008 | 3/4/2008 | | DEFR |
Dave Hannah
|
|
|
sent to 410
|
BLD-Aging Inspection | 1/3/2008 | 1/3/2008 | 1/3/2008 | | DEFR |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 9/18/2007 | 9/18/2007 | 9/20/2007 | | FAIL |
Dave Hannah
|
|
|
needs fire signoffs
|
BLD-Aging Inspection | 7/19/2007 | 7/19/2007 | 7/23/2007 | | PASS |
Dave Hannah
|
|
|
NEEDS FIRE FINAL
|
BLD-Aging Inspection | 8/2/2006 | 8/2/2006 | 8/8/2006 | | DEFR |
Forrest France
|
|
|
|
BLD-Aging Inspection | 1/5/2006 | 1/5/2006 | 1/5/2006 | | PASS |
Dave Hannah
|
|
|
waiting for fire final
|
BLD-Aging Inspection | 11/2/2005 | 11/2/2005 | 11/3/2005 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/1/2005 | 4/1/2005 | 4/4/2005 | | NR |
Troy Cobbley
|
|
|
Need fire alarm permit finaled
|
BLD-Aging Inspection | 8/9/2004 | 8/9/2004 | 8/9/2004 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 6/8/2004 | 6/8/2004 | 6/8/2004 | | PASS |
Dave Hannah
|
|
|
wip 6/8/2004 9:27:47 AM
|
BLD-Aging Inspection | 8/18/2003 | 8/18/2003 | 8/18/2003 | | DONE |
Carl Dependahl
|
|
|
awaiting damper install at bsmt ducts & misc items for "final" 8/18/2003 9:12:50 AM
|
BLD-Conference | 6/2/2003 | 6/3/2003 | 6/3/2003 | P | PASS |
Carl Dependahl
|
|
|
w/ 6/4/2003 10:10:10 AM
|
BLD-Conference | 6/2/2003 | 6/2/2003 | 6/2/2003 | P | PASS |
Carl Dependahl
|
|
|
w/ scott 6/2/2003 2:55:34 PM
|
BLD-Final | 5/30/2003 | 6/2/2003 | 6/2/2003 | A | PART |
Carl Dependahl
|
|
|
ok for t/o pend fire final, must resolve agreement issues. 6/2/2003 3:18:23 PM
|
FIRE-Final Inspection | 5/30/2003 | 6/2/2003 | 6/2/2003 | A | FAIL |
Rick Jackson
|
|
|
scott sprinkler overspaced outside of conference room 4 and it needs an alarm notification horn/strobe; sprinkler over 9 foot from wall inside conference room 4 6/2/2003 3:41:12 PM
|
BLD-Conference | 5/30/2003 | 5/30/2003 | 5/30/2003 | A | PASS |
Carl Dependahl
|
|
|
Scott...call in associated permits for final. 5/30/2003 2:31:24 PM
|
BLD-Final | 5/29/2003 | 5/30/2003 | 5/30/2003 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 5/29/2003 at 7:52:08 PM. Contact: ###-####.
|
FIRE-Final Inspection | 5/29/2003 | 5/30/2003 | 5/30/2003 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 5/29/2003 at 7:53:01 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/14/2003 | 5/15/2003 | 5/15/2003 | P | PART |
Carl Dependahl
|
|
|
2nd fl, ele ok at walls. 5/15/2003 4:35:15 PM
|
BLD-Framing/Rough-in | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | PART |
Carl Dependahl
|
|
|
west portion 2nd fl walls, look ok pending trades insps. 5/15/2003 1:24:23 PM
|
BLD-Framing/Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 5/13/2003 at 8:09:26 PM. Contact: ###-####.
|
BLD-Final | 5/5/2003 | 5/6/2003 | 5/6/2003 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/5/2003 at 5:10:05 PM. Contact: ###-####.
|
BLD-Final | 5/6/2003 | 5/6/2003 | 5/6/2003 | P | PART |
Carl Dependahl
|
|
|
ok to use rm 246,c/n, other finals (alarms, elec) ok for t/o 5/6/2003 4:21:58 PM
|
FIRE-Final Inspection | 5/5/2003 | 5/6/2003 | 5/6/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/5/2003 at 5:08:29 PM. Contact: ###-####. okay for area occupied by the old conference room 5/6/2003 2:06:54 PM
|
BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | FAIL |
Carl Dependahl
|
|
|
keep c/n 4/15/2003 2:21:11 PM
|
BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | PART |
Carl Dependahl
|
|
|
reinsp...straps added, braces to be installed after glazing assy's...ok to cover walls. 4/16/2003 10:20:17 AM
|
BLD-Framing/Rough-in | 4/14/2003 | 4/15/2003 | 4/15/2003 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 4/14/2003 at 4:28:42 PM. Contact: ###-####...keep c/n 4/15/2003 2:24:08 PM
|
BLD-Framing/Rough-in | 4/10/2003 | 4/11/2003 | 4/11/2003 | P | NR |
Carl Dependahl
|
|
|
keep c/n....ok to strap studs or equivalent, bracing to be installed afer windows per Scott, Supt. 4/11/2003 2:03:42 PM
|
BLD-Framing/Rough-in | 4/10/2003 | 4/11/2003 | 4/11/2003 | A | FAIL |
Carl Dependahl
|
|
|
wORKING NIGHTS...2ND FL...c/n, brace walls, splice or add full ht. studs. 4/11/2003 1:29:58 PM
|
BLD-Framing/Rough-in | 4/9/2003 | 4/10/2003 | 4/10/2003 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 4/9/2003 at 11:51:00 PM. Contact: ###-####.
|
BLD-Final | 2/27/2003 | 2/27/2003 | 2/27/2003 | P | PART |
Carl Dependahl
|
|
|
scott ...ok to use P&Z area at 2nd fl...existing "city" side of bldg. 2/27/2003 1:14:59 PM
|
BLD-Final | 2/21/2003 | 2/24/2003 | 2/24/2003 | A | NR |
Carl Dependahl
|
|
|
fn -scott ###-####
|
BLD-Final | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | FAIL |
Carl Dependahl
|
|
|
scott, c/n: verify other finals, smoke/fire damper locations, misc finish... ok for t/o 2/24/2003 4:59:58 PM
|
FIRE-Final Inspection | 2/24/2003 | 2/24/2003 | 2/24/2003 | A | PART |
Rick Jackson
|
|
|
per Dave Miller temp occ is approved pending resolution of getting the elevator machine room fire sprinklered; alternate floor recall for elevator; notification devices in walkways and lobby; updated map at FACP 2/24/2003 1:26:02 PM
|
BLD-Framing/Rough-in | 2/20/2003 | 2/20/2003 | 2/20/2003 | P | CANC |
Carl Dependahl
|
|
|
clg grid adjacent to records...add seismic strut ok pend elec/hvac ok's...intall
|
BLD-Framing/Rough-in | 2/20/2003 | 2/20/2003 | 2/20/2003 | P | PART |
Carl Dependahl
|
|
|
grid; add strut...chk at final leave out that tile.
|
BLD-Final | 2/18/2003 | 2/19/2003 | 2/19/2003 | P | NR |
Carl Dependahl
|
|
|
SCOTT; Phone #: ###-#### Internet Inspection Request from: Darla Downs... 2/20/2003 2:13:42 PM...nr, need fire ok'd. 2/20/2003 2:15:31 PM
|
FIRE-Final Inspection | 2/18/2003 | 2/19/2003 | 2/19/2003 | P | FAIL |
Rick Jackson
|
|
|
SCOTT; Phone #: ###-#### Internet Inspection Request from: Darla Downs FACP's aren't talking to each other; need supervised tamper switches; need horn/strobes working per NFPA 72 2/19/2003 5:06:28 PM
|
BLD-Conference | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | PASS |
Carl Dependahl
|
|
|
###-####...need fire ok for t/o. 2/18/2003 5:24:07 PM
|
FIRE-Conference | 2/18/2003 | 2/18/2003 | 2/18/2003 | P | PART |
Rick Jackson
|
|
|
###-#### met with Scott about final requirements; will need alarm plans as they are "ready" for pick up at permit desk 2/18/2003 4:14:26 PM
|
BLD-Framing/Rough-in | 2/4/2003 | 2/5/2003 | 2/5/2003 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/04/2003 at 15:48:32. Contact: ###-####....raised floor area...walls ok pend elec 2/5/2003 4:32:19 PM
|
BLD-Framing/Rough-in | 1/20/2003 | 1/21/2003 | 1/21/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/20/2003 at 15:01:53. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/20/2003 | 1/21/2003 | 1/21/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/20/2003 at 15:01:53. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | PART |
Carl Dependahl
|
|
|
scott...computer rm floor joisting/bridging ok to "deck" 1/21/2003 1:33:19 PM 1/21/2003 1:33:59 PM
|
BLD-Framing/Rough-in | 1/16/2003 | 1/16/2003 | 1/16/2003 | P | NR |
Carl Dependahl
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...need to install blocking/or bridging at slice point per revised eng'g at 2nd fl( raised) former computer room, joisting ok...recall prior to pan install. 1/16/2003 4:26:20 PM
|
BLD-Framing/Rough-in | 1/9/2003 | 1/10/2003 | 1/10/2003 | A | PART |
Carl Dependahl
|
|
|
ceiling insp scott ###-####, grid ok for tile 1/10/2003 2:53:22 PM
|
BLD-Conference | 12/23/2002 | 12/23/2002 | 12/23/2002 | P | PASS |
Carl Dependahl
|
|
|
W? Kevin Schultz...seal all shaft penetrations 12/23/2002 3:29:42 PM
|
BLD-Conference | 12/4/2002 | 12/5/2002 | 12/5/2002 | P | PASS |
Carl Dependahl
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...w/arch... 12/5/2002 4:09:43 PM
|
BLD-Framing/Rough-in | 12/2/2002 | 12/2/2002 | 12/2/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/02/2002 at 07:05:01. Contact: ###-####...partition walls ok to cover, need firestop or seal rated assy's at shafts & exit enclosures 12/2/2002 1:28:48 PM
|
BLD-Framing/Rough-in | 11/13/2002 | 11/15/2002 | 11/15/2002 | A | PART |
Jim Storey
|
|
|
###-#### ###-#### fire stopping in restarooms at tile wyanes coat. 11/15/2002 1:27:58 PM
|
BLD-Conference | 11/5/2002 | 11/5/2002 | 11/5/2002 | P | PASS |
Carl Dependahl
|
|
|
Scott...c/n issued r 11/5/02 3:17:05 PM e shaft openings & penetrations 11/5/02 3:17:27 PM
|