BLD-Final | 10/1/2002 | 10/1/2002 | 10/1/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### bill
|
BLD-Framing/Rough-in | 8/14/2002 | 8/15/2002 | 8/15/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 8/14/2002 | 8/14/2002 | 8/14/2002 | P | PART |
Dave Hannah
|
|
|
the later the better ###-#### shear ok to cover ext 8/14/2002 3:16:45 PM
|
BLD-Foundation | 7/11/2002 | 7/12/2002 | 7/12/2002 | A | PART |
Russ Owen
|
|
|
cal ###-#### found wall there are (3) #4 in the wall with verts on 4 foot, the engineer is to supply a new detail for as constructed, contractor on site,said this will be done. Subject to detail. 7/12/2002 1:28:36 PM
|
BLD-Footing | 7/11/2002 | 7/11/2002 | 7/11/2002 | P | PART |
Russ Owen
|
|
|
ft insp- cal ###-#### Arived on site waiting for 1/2 the rebar to be delivered, no approved plans on site footing is not per plan, I have made (2) phone calls, got ahold of the engineer and he verbally said footing would be ok at 14" wide with (2) # 4 horizontals in the footing. Un-approved plans at the site, indicate a 20 " wide footing with (4) #4 bars horizontal. Have been on job site approximately 45 min to do a 5 min inspection also note the concrete truck is on site now. I told them there needs to be an approved plan at the job site for the wall inspection or there will be no pour, As is pouring at there own risk. 7/11/2002 5:02:42 PM 7/11/2002 5:12:57 PM
|