BLD-Final | 9/17/2002 | 9/18/2002 | 9/18/2002 | A | PASS |
Jim Sly
|
|
|
###-#### C/C issued. 9/18/2002 11:12:38 AM
|
FIRE-Final Inspection | 9/18/2002 | 9/18/2002 | 9/18/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled. New fire alarm panel to be installed with in 6 months per agreement with the boise fire dept. 9/19/2002 11:16:30 AM
|
BLD-Final | 9/6/2002 | 9/9/2002 | 9/9/2002 | P | CANC |
Dave Hannah
|
|
|
neil; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 9/6/2002 | 9/9/2002 | 9/9/2002 | A | FAIL |
Troy Cobbley
|
|
|
repair the fire alarm panel and provide the required smoke detector, pull station and notification with approved drawings 9/9/2002 1:42:32 PM
|
FIRE-Final Inspection | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | FAIL |
Troy Cobbley
|
|
|
replace painted sprinkler head in restroom 9/6/2002 11:09:48 AM
|
BLD-Framing/Rough-in | 8/21/2002 | 8/21/2002 | 8/21/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/21/2002 at 08:31:45. Contact: ###-####.ok to cover after elec and plumb r/i sign off 8/21/2002 7:08:20 PM
|