Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-01674
StatusFinaled
Name BITTERCREEK ALEHOUSE (EXPANSION)
Site Address 246 N 8TH ST (1ST FLR)
Project NameFIDELITY BLDG
Customer Number 
ePlanReviewNo
Description
(BITTERCREEK ALEHOUSE) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To expand an existing restaurant/bar on the first floor of a 25,970 square foot building into an existing adjacent area. The expansion area will have a 1,005 square foot first floor, 335 square foot basement, and a 324 square foot mezzanine. Work is to include concrete footings, steel columns, steel beams, concrete pan deck, new stairway, cable guardrails, Type I hood and 1-hr shafts, a stone hearth oven, a "wine tower", and interior finishes all per approved drawings, engineering, and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/16/20031/17/20031/17/2003PPASS
DetailsCarl Dependahl
tarrie; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...c/n ok, ok for c/o. 1/17/2003 3:17:34 PM
Permanent Occupancy 1/17/20031/17/2003 DONE
Details
FIRE-Final Inspection12/23/200212/23/200212/23/2002PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/23/2002 at 09:05:50. Contact: ###-####.
BLD-Final12/19/200212/20/200212/20/2002PFAIL
DetailsCarl Dependahl
todd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie; c/n handrails, rec'd spec insp reports; ok for t/o, 90 days 12/20/2002 5:00:40 PM
BLD-Conference12/19/200212/19/200212/19/2002APASS
DetailsCarl Dependahl
need to return spiral stair rails, extensions as needed...ok not to extend rail into doorways.
BLD-Final12/17/200212/18/200212/18/2002PCANC
DetailsCarl Dependahl
todd-###-####
FIRE-Final Inspection12/17/200212/18/200212/18/2002APART
DetailsRick Jackson
###-####-todd temp approved per Dave Miller; need to test the alarms for the entire building 12/18/2002 1:40:35 PM
BLD-Final12/16/200212/16/200212/16/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/16/2002 at 10:28:20. Contact: ###-####....NR, need fire/alarms ok'd, complete railings, etc. no further insp. 12/16/2002 2:08:00 PM
BLD-Conference10/31/200211/5/200211/5/2002PPASS
DetailsCarl Dependahl
w/ Todd & Dave Dechambeau...flash hood & shaft, spiral stairs to have min headroom... 11/5/02 4:46:11 PM
BLD-Conference10/31/200210/31/200210/31/2002PPASS
DetailsCarl Dependahl
need full 6'6" headroom at stairs
BLD-Conference10/30/200210/30/200210/30/2002PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/30/2002 at 10:03:31. Contact: ###-####....keep c/n re stairs to Mezzanine. wip on spiral stair...chk min 6-6 headroom...max 9.5" rise allowed 10/31/2002 2:20:00 PM
BLD-Framing/Rough-in10/28/200210/29/200210/29/2002AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/28/2002 at 15:40:16. Contact: ###-####....part, need change stairs to mezz...ok to add duct wrap at horiz. portion of grease duct prior to shaft...maintain clearances 10/29/02 5:00:11 PM
BLD-Framing/Rough-in10/17/200210/18/200210/18/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/17/2002 at 11:48:05. Contact: ###-####. left msg,..no response. 10/18/02 10:13:19 AM kitch 1/2 wall ok 10/18/02 2:44:02 PM
BLD-Conference10/11/200210/14/200210/14/2002APASS
DetailsCarl Dependahl
Todd...exit path must be separated from "storage" rooms. 10/14/02 11:01:39 AM
BLD-Conference10/10/200210/11/200210/11/2002APASS
DetailsCarl Dependahl
11am Tarrie...ok to move bsmt door...maintain accessibility 10/11/02 1:36:52 PM
BLD-Conference10/10/200210/11/200210/10/2002ACANC
DetailsCarl Dependahl
Tarrie 11am
BLD-Conference10/10/200210/11/200210/10/2002APASS
DetailsCarl Dependahl
w/ arch re bsmt exit path 10/10/02 4:04:03 PM
BLD-Framing/Rough-in10/8/200210/9/200210/9/2002APART
DetailsCarl Dependahl
TODD...wall behind kitch appliances at main fl. ok to cover pending plbg r/i ok'd. 10/9/02 10:53:06 AM
BLD-Framing/Rough-in10/8/200210/8/200210/8/2002PNR
DetailsCarl Dependahl
###-####
BLD-Conference9/17/20029/18/20029/18/2002PPASS
DetailsCarl Dependahl
Todd, MTI to report for deck/slab... 9/18/2002 7:03:27 PM
BLD-Concrete9/17/20029/17/20029/17/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/17/2002 at 10:58:44. Contact: ###-####....pan, welding & deck under spec insp. 9/17/2002 4:32:23 PM
BLD-Footing8/28/20028/29/20028/29/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/28/2002 at 12:23:06. Contact: ###-####...isolated ftgs for mezzanine in bsmt...ok 8/29/2002 4:13:47 PM