BLD-Final | 3/18/2003 | 3/19/2003 | 3/19/2003 | A | PASS |
Russ Owen
|
|
|
ATH; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 3/18/2003 | 3/18/2003 | 3/18/2003 | P | FAIL |
Russ Owen
|
|
|
###-####
|
BLD-Energy code compliance | 12/4/2002 | 12/4/2002 | 12/4/2002 | P | PASS |
Jim Sly
|
|
|
###-#### william Frame OK. 12/4/2002 4:47:05 PM
|
BLD-Framing/Rough-in | 11/29/2002 | 12/2/2002 | 12/2/2002 | A | CANC |
Russ Owen
|
|
|
JUNE; Phone #: ###-#### Internet Inspection Request from: Darla Downs. need insulation complete prior. 12/2/2002 12:37:44 PM
|
BLD-Framing/Rough-in | 11/27/2002 | 11/27/2002 | 11/27/2002 | P | FAIL |
Russ Owen
|
|
|
c/n posted also there is to be no drywall untill the gas test is passed, I have told this to mec contractor. 11/27/2002 2:18:26 PM
|
BLD-Framing/Rough-in | 11/22/2002 | 11/25/2002 | 11/25/2002 | A | NH |
Steven Webb
|
|
|
###-#### C/N No access-house locked up -- telephones 2 numbers--not answer--recall. 11/25/2002 9:10:24 AM
|
BLD-Framing/Rough-in | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | NR |
Steven Webb
|
|
|
###-#### C/N posted--Partial inspection only--Do not insulate. 11/25/2002 1:43:39 PM
|
BLD-Framing/Rough-in | 11/20/2002 | 11/20/2002 | 11/20/2002 | P | NR |
Russ Owen
|
|
|
fr jack- ###-#### . Needs foam seal package, truss details in order, noted some missing they had recovered them from the trash,also needs a gas test .c/n posted.11/20/2002 4:56:20 PM 11/20/2002 5:08:15 PM
|
BLD-Framing/Rough-in | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | PASS |
Russ Owen
|
|
|
ok to side. 10/30/2002 9:51:12 AM
|
BLD-Framing/Rough-in | 10/29/2002 | 10/29/2002 | 10/29/2002 | P | PART |
Russ Owen
|
|
|
###-####. went over rear wall hds requirements with engineer, they are now in place, this plan is very confused, and should have been sent back and resubmitted correctyly so that foundation contractor could have installed hds with no confusion. I have spent over an hour here today as well as prior inspections. Also house papered with out approvals. 10/29/2002 4:41:54 PM
|
BLD-Framing/Rough-in | 10/25/2002 | 10/28/2002 | 10/28/2002 | A | NR |
Russ Owen
|
|
|
ATH; Phone #: ###-#### Internet Inspection Request from: Darla Downsn 10/28/2002 9:37:11 AM need plans on site also some one to be on site for inspection. 10/28/2002 9:38:01 AM
|
BLD-Wall cover | 10/25/2002 | 10/25/2002 | 10/25/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/25/2002 at 11:23:41. Contact: ###-####. See corr on site. 10/25/2002 3:24:08 PM
|
BLD-Framing/Rough-in | 10/21/2002 | 10/21/2002 | 10/21/2002 | P | FAIL |
Russ Owen
|
|
|
###-####posted c/n. 10/21/2002 3:10:30 PM
|
BLD-Conference | 10/18/2002 | 10/18/2002 | 10/18/2002 | P | FAIL |
Russ Owen
|
|
|
Stoped by job and found no recored of approval to cover exterior called builder and informed. he will call for inspection house has been papered for stucco. 10/18/2002 2:38:43 PM
|
BLD-Foundation | 8/12/2002 | 8/13/2002 | 8/13/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/12/2002 at 16:21:28. Contact: ###-####.wip. 8/13/2002 9:48:51 AM
|
BLD-Footing | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 07:28:32. Contact: ###-####. wip. 8/9/2002 2:51:53 PM
|