BLD-Final | 4/29/2003 | 4/30/2003 | 4/30/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/29/2003 at 4:30:57 PM. Contact: ###-####.c.c # 22907 issued 4/30/2003 10:22:56 AM
|
BLD-Grading Inspection | 4/30/2003 | 4/30/2003 | 4/30/2003 | | DONE |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
BLD-Final | 4/24/2003 | 4/25/2003 | 4/25/2003 | A | CANC |
Dave Hannah
|
|
|
titus; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 4/25/2003 | 4/25/2003 | 4/25/2003 | P | CANC |
Dave Hannah
|
|
|
|
BLD-Final | 4/21/2003 | 4/22/2003 | 4/22/2003 | P | FAIL |
Steven Webb
|
|
|
TITUS; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N on site. 4/22/2003 2:49:36 PM
|
BLD-Energy code compliance | 12/2/2002 | 12/3/2002 | 12/3/2002 | P | PASS |
Jim Sly
|
|
|
late pm ###-####
|
BLD-Framing/Rough-in | 12/2/2002 | 12/2/2002 | 12/2/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### titus all c/n items completed ok to insulate 12/2/2002 4:34:27 PM
|
BLD-Framing/Rough-in | 11/27/2002 | 11/29/2002 | 11/29/2002 | P | FAIL |
Steven Webb
|
|
|
###-####C/N issued--Need electrical r. in and foam seal before ok to insulate can be granted. Recall 11/29/2002 1:45:22 PM
|
BLD-Wall cover | 11/26/2002 | 11/27/2002 | 11/27/2002 | A | PASS |
Alan Hauser
|
|
|
hold down as per plans, nailing ok, hold downs in basement just epoxied (?) nuts not fastened 11/27/2002 2:09:39 PM
|
BLD-Framing/Rough-in | 11/25/2002 | 11/26/2002 | 11/26/2002 | A | CANC |
Jim Storey
|
|
|
###-#### ###-####out of time sent to hanna 11/26/2002 4:34:16 PM
|
BLD-Framing/Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 | A | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Grading Inspection | 10/11/2002 | 10/11/2002 | 10/11/2002 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer approved the subgrade below the basement floor slab and the interior bearing wall footings.
|
BLD-Foundation | 9/27/2002 | 10/1/2002 | 10/1/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 16:51:16. Contact: ###-####.wip 10/1/2002 2:06:16 PM
|
BLD-Footing | 9/24/2002 | 9/24/2002 | 9/24/2002 | A | PART |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 9/24/2002 | 9/24/2002 | 9/24/2002 | | DONE |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer.
|
BLD-Footing | 9/20/2002 | 9/23/2002 | 9/23/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 13:28:51. Contact: ###-####. needs soils report 9/23/2002 4:36:37 PM
|