Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01851
StatusFinaled
Name KURT GIBBS
Site Address 1120 N MILWAUKEE ST
Project NamePARKS GIBBS-SHELL PAD A
Customer Number 
ePlanReviewNo
Description
Park/Gibbs Development * Retail/Restaurant Shell Building (Pad "A") - To construct a new 3295 square foot, one story, wood framed retail shell building with related site improvements. The building also includes a one-hour tenant demising wall, running east and west, dividing the building into two future tenant spaces. The 1500 square foot, south tenant space will include an accessible restroom and a vanilla finish. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building is considered part of the building to the south for exterior wall and opening protecton requirements. That building was built under permit BLD02-01461. All construction per the approved plans and attached comment list. DRH02-00097/CUP02-00078/PC#481-02/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/24/20063/24/20063/24/2006 CANC
DetailsMike Jordan
DOC - Permit Finaled3/24/20063/24/20063/24/2006APASS
DetailsMike Jordan
Project has already benn finaled by others as per history.
Code Occupancy Approval  1/10/2003 PASS
ALL LANDSCAPE AND OTHER REQUIREMENTS IN, FINAL SIGNED OFF.
BLD-Final1/8/20031/9/20031/9/2003PPASS
DetailsRuss Owen
###-#### JIM This is ok for a perm oc if all required signat 1/13/2003 1:27:17 PM ures are on card. 1/13/2003 1:27:28 PM
FIRE-Final Inspection1/8/20031/9/20031/9/2003ACANC
DetailsTroy Cobbley
inspection not needed it already has a fire life safety sign off 1/9/2003 10:13:16 AM
BLD-Final12/19/200212/20/200212/20/2002PPART
DetailsRuss Owen
###-#### jim > ok for a permanent oc peding all required sign offs on job card. 12/20/2002 12:53:32 PM
FIRE-Final Inspection12/19/200212/20/200212/20/2002APASS
DetailsTroy Cobbley
Life safety on shell and vanilla finish finaled 12/20/2002 11:01:57 AM
BLD-Final12/19/200212/19/200212/19/2002PNR
DetailsTom Arcoraci
###-####
BLD-Final12/19/200212/19/200212/19/2002PNR
DetailsCarl Dependahl
###-####, need other finals 12/19/2002 4:37:49 PM
FIRE-Final Inspection12/19/200212/19/200212/19/2002PNR
DetailsTroy Cobbley
jim with steed costruction said they were not ready due to the wron ballast for the emergency lights 12/19/2002 1:20:02 PM
BLD-Framing/Rough-in12/13/200212/13/200212/13/2002PPASS
DetailsRuss Owen
JIM--CEILING GRID; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in12/11/200212/12/200212/12/2002AFAIL
DetailsRuss Owen
ceiling grid jim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieneeds lighting installed and perimeter wires. 12/12/2002 11:54:36 AM
BLD-Framing/Rough-in11/25/200211/25/200211/25/2002AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/25/2002 at 00:22:54. Contact: . not ready at 9:30 am 11/25/2002 9:37:52 AM
BLD-Framing/Rough-in11/25/200211/25/200211/25/2002PPART
DetailsCarl Dependahl
###-####...blocking, straps & int shear ok 11/26/2002 9:20:11 AM
BLD-Framing/Rough-in11/21/200211/22/200211/22/2002PPART
DetailsRuss Owen
###-####, WROTE A C/N ON PRIOR C/N FROM 340 TO ADD THE INTERIOR SIDE OF THE EST WALL AS SHOWN ON PLANS. 11/22/2002 4:15:44 PM
BLD-Conference11/21/200211/21/200211/21/2002PPASS
DetailsCarl Dependahl
w/ Steed...left c/n, but ok to insulate. 11/21/02 1:53:04 PM
BLD-Framing/Rough-in11/20/200211/21/200211/21/2002APART
DetailsCarl Dependahl
see notes under last inspection. 11/20/2002 5:20:46 PM; c/n re: complete coil strap/blocks at east wall, firestopping...ok to insul "shell" side... 11/21/02 10:38:08 AM
BLD-Framing/Rough-in11/20/200211/20/200211/20/2002PPART
DetailsRuss Owen
Conference only with jim from steed, the schell needs an interior frame inspection prior to ve framing for tennant , went over this with steed as they are not doing the tennent improvement, did note some items for interior frame with jim at the shear inspections, a side wall strap was needed at the east wall and some anchor bolts at plate breaks. This will be called in for an am inspection. 11/20/2002 3:59:30 PM
BLD-Framing/Rough-in10/31/200211/1/200211/1/2002AFAIL
DetailsRuss Owen
jim ; Phone #: ###-#### Internet Inspection Request from: Marsha SmylieSame corrections with shear panels. Contractor notified , will charge a re-inspection fee next time i ave been here 3 times for the same thing. 11/1/2002 10:09:13 AM
BLD-Framing/Rough-in11/1/200211/1/200211/1/2002PPART
DetailsRuss Owen
ok to side. 11/1/2002 4:09:12 PM
BLD-Framing/Rough-in10/30/200210/31/200210/31/2002AFAIL
DetailsRuss Owen
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungShear at hds needs to be complete. 10/31/2002 10:54:20 AM
BLD-Framing/Rough-in10/29/200210/30/200210/30/2002ANR
DetailsRuss Owen
need ladder to roof 10/30/2002 5:24:12 PM
BLD-Framing/Rough-in10/28/200210/29/200210/29/2002APART
DetailsRuss Owen
###-####. still makeing repairs. 10/29/2002 2:27:29 PM
BLD-Framing/Rough-in10/24/200210/28/200210/28/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/24/2002 at 12:13:20. Contact: ###-####.c/n on site. 10/28/2002 2:13:15 PM
BLD-Footing10/2/200210/3/200210/3/2002APART
DetailsRuss Owen
jim- & slab to bld; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie s-i is there on site. 10/3/2002 11:14:21 AM
BLD-Foundation9/23/20029/24/20029/24/2002APASS
DetailsRuss Owen
###-####
BLD-Footing9/17/20029/18/20029/18/2002PPASS
DetailsRuss Owen
###-####