Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01945
StatusFinaled
Name PRESTIGE HOMES INC
Site Address 5078 E STEMWOOD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To build a new 2907s.f. 2-story single family dwelling with 2287s.f. on the main level and 620s.f. on the upper level created using attic type trusses over the 916s.f. attached 2-car garage. R-1C / DA setbacks ok per redlining per akt for driveway placement. All per the approved plans as marked and attached conditions. PC# 0470 pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/3/20033/4/20033/4/2003PPASS
DetailsDave Hannah
###-#### call for access c.c # 23789 issued 3/4/2003 1:43:04 PM
BLD-Final2/28/20033/3/20033/3/2003AFAIL
DetailsDave Hannah
###-#### access code 193 c/n on site 3/3/2003 9:46:24 AM
BLD-Energy code compliance12/16/200212/17/200212/17/2002APASS
DetailsDave Hannah
TERRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to cover 12/17/2002 9:08:19 AM
BLD-Framing/Rough-in12/11/200212/12/200212/12/2002APASS
DetailsDave Hannah
###-#### TERRY
BLD-Framing/Rough-in12/9/200212/10/200212/10/2002ANR
DetailsDave Hannah
terry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in12/10/200212/10/200212/10/2002PFAIL
DetailsDave Hannah
c/n on site ok to insulate 12/10/2002 3:28:58 PM
BLD-Framing/Rough-in12/9/200212/9/200212/9/2002PFAIL
DetailsDave Hannah
###-#### terry needs to have foam seal package installed befor calling for framing insp no inspection done at this time 12/9/2002 1:52:00 PM
BLD-Framing/Rough-in11/22/200211/22/200211/22/2002PPART
DetailsDave Hannah
shear ok to cover ext
BLD-Framing/Rough-in11/13/200211/14/200211/14/2002PFAIL
DetailsDave Hannah
###-#### hold downs under windows some panels note blocked some areas need to be restapled need engineering on hold donws and area that wall line was changed also needs to finish roof 11/14/2002 2:52:39 PM
BLD-Foundation9/9/20029/10/20029/10/2002APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/09/2002 at 08:59:44. Contact: ###-####.rebar in place no panels in place. 9/10/2002 10:20:08 AM
BLD-Footing9/9/20029/9/20029/9/2002PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/09/2002 at 08:59:07. Contact: ###-####. wip ok 9/9/2002 2:07:35 PM