BLD-Final | 6/21/2004 | 6/21/2004 | 6/21/2004 | P | PASS |
Dave Hannah
|
|
|
Andy, ###-#### - hand rail is now installed at top of ramp - please confirm & let me know. Thanks, Cathy ~ ok for occ 6/21/2004 2:31:06 PM
|
BLD-Final | 5/28/2004 | 6/1/2004 | 6/1/2004 | P | NR |
Dave Hannah
|
|
|
Andy, ###-#### finish gard rail at top of ada ramp 6/1/2004 2:40:43 PM
|
BLD-Final | 5/26/2004 | 5/27/2004 | 5/27/2004 | A | FAIL |
Russ Owen
|
|
|
I have the card - everything signed off. Please confirm steel ramp has been installed & approved (located behind bldg.) Thanks, Cathy ~. No plans for the ramp on site, also guardrail at landing is not 42in high and needs addnl guard rail at the east end. 5/27/2004 12:26:38 PM
|
BLD-Final | 5/26/2004 | 5/26/2004 | 5/26/2004 | | NH |
Jim Sly
|
|
|
I have the occ. card - please confirm that steel ramp on back of bldg. has been completed. That is the only issue holding this project up. Thanks ~ Cathy
|
BLD-Conference | 2/10/2004 | 2/10/2004 | 2/10/2004 | P | DONE |
Dave Hannah
|
|
|
dennis ###-#### -call 1st before insp
|
BLD-Conference | 12/19/2003 | 12/22/2003 | 12/22/2003 | A | CANC |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | FAIL |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore A D A ramp out the back door not installed 9/3/2003 12:21:44 PM
|
BLD-Conference | 8/9/2003 | 8/11/2003 | 8/11/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/9/2003 at 9:02:58 AM. Contact: ###-####....re handrail c/n, need detail of fix. 8/11/2003 12:32:01 PM
|
BLD-Final | 8/3/2003 | 8/4/2003 | 8/4/2003 | P | PART |
Carl Dependahl
|
|
|
ok for t/o...c/n re rails, etc. 8/4/2003 4:17:29 PM
|
FIRE-Final Inspection | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PASS |
Rick Jackson
|
|
|
###-#### fire/life safety okay; signed temp occ for Carl D. 8/1/2003 4:20:26 PM
|
BLD-Final | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | FAIL |
Carl Dependahl
|
|
|
###-#### dennis, c/n rails, firestops at bsmt, dampers, signatures... 7/31/2003 12:15:10 PM
|
BLD-Framing/Rough-in | 7/29/2003 | 7/30/2003 | 7/30/2003 | A | DONE |
Dave Hannah
|
|
|
###-#### no framing to look at pre walked with contractor befor final 7/30/2003 10:55:49 AM
|
BLD-Conference | 7/15/2003 | 7/17/2003 | 7/17/2003 | A | PASS |
Carl Dependahl
|
|
|
need reactivate hvac, plbg permits. 7/17/2003 11:58:54 AM
|
BLD-Conference | 7/15/2003 | 7/15/2003 | 7/15/2003 | P | PASS |
Carl Dependahl
|
|
|
w/mech contractor, need advise re hood 7/15/2003 5:26:52 PM
|
BLD-Final | 3/3/2003 | | 3/3/2003 | A | CANC |
Carl Dependahl
|
|
|
i put wrong bld # in ///dld
|
BLD-Conference | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####...hood & shaft postponed 11/1/02 5:34:07 PM
|
BLD-Conference | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | DONE |
Tom Arcoraci
|
|
|
###-####
|
BLD-Conference | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | CANC |
Dave Hannah
|
|
|
###-####
|
BLD-Conference | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 10/31/2002 | 11/1/2002 | 11/1/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/31/2002 at 19:18:59. Contact: ###-####....partition walls ok 11/1/02 5:34:30 PM
|
BLD-Framing/Rough-in | 10/23/2002 | 10/23/2002 | 10/23/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 07:51:55. Contact: ###-####...ok to rock int partitions as ok'd. 10/23/02 4:43:38 PM
|