Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD02-02126
StatusFinaled
Name VELTEX BUILDING LLC
Site Address 420 W MAIN ST
Project NameVELTEX BUILDING-SHELL
Customer Number 
ePlanReviewNo
Description
(VELTEX BUILDING-SHELL) To construct a new five-story, with a basement parking garage, 53,265 sq.ft. Type II 1-Hour, shell and core mixed-use building. NOTE: Stand pipes and the installation of a NFPA 13 fire sprinkler system is required for story increase and can not be used for any ather purpose. GRADING PERMIT # BLD 02-02575 & ESC 02-00403 PC#563-02 MJP DRH01-00023 TW CUP98-00065 SR
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/27/20045/28/20045/28/2004APASS
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm occ 5/28/2004 10:32:35 AM
Code Occupancy Approval5/27/20045/27/20045/27/2004APASS
DetailsWm. Michael Meloy
Compliance met. 5/27/2004 12:18:16 PM
Code Occupancy Approval  5/27/2004  
DetailsWm. Michael Meloy
FIRE-Alarm Testing5/18/20045/19/20045/19/2004APASS
DetailsRick Jackson
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in2/11/20042/12/20042/12/2004APART
DetailsDave Hannah
jim ###-#### 4th floor ceiling grid in corr 2/12/2004 10:02:37 AM
BLD-Framing/Rough-in2/11/20042/12/20042/12/2004APART
DetailsDave Hannah
jim ###-#### 4th floor ceiling grid in corr 2/12/2004 10:02:37 AM
BLD-Final1/13/20041/14/20041/14/2004ANR
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final1/14/20041/14/20041/14/2004PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp occ needsalarm sign off finish shell 4th floore xt 1/14/2004 5:16:40 PM
FIRE-Final Inspection1/13/20041/14/20041/14/2004APART
DetailsRick Jackson
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie per Dave Miller a temp occupancy is approved pending review/inspection of fire alarm resubmittals 1/14/2004 3:08:20 PM
BLD-Final1/13/20041/13/20041/13/2004PFAIL
DetailsDave Hannah
mike ; Phone #: ###-#### Internet Inspection Request from: Annette Moore mike has a list of corrections 1/13/2004 3:54:09 PM
FIRE-Final Inspection1/12/20041/13/20041/13/2004AFAIL
DetailsRick Jackson
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie per Mike Phillips resubmittals needed for access control doors that are located on the south side exit; need approval of fire alarm plan resubmittals 1/13/2004 1:48:59 PM
FIRE-Final Inspection1/9/20041/12/20041/12/2004PFAIL
DetailsRick Jackson
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes need stairwell signage; verify labels on all rated doors; remove baggies from heads on second floor; clean sprinkler head in HC parking stall; add signage on all sprinler drains; add concealer escutcheons on second floor restroom heads 1/12/2004 3:29:43 PM
Code Occupancy Approval Temp1/8/20041/8/20041/8/2004PDONE
DetailsWm. Michael Meloy
Approved bonding for $6,000.00 for landscaping and temp occupancy of third floor. 1/8/2004 1:37:48 PM
FIRE-Final Inspection1/5/20041/8/20041/8/2004AFAIL
DetailsRick Jackson
mike-- ###-#### need to complete alarm and sprinkler permits; need to complete stairwells for egress to include doors and lights 1/8/2004 11:16:01 AM
BLD-Framing/Rough-in1/6/20041/7/20041/7/2004PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in12/2/200312/2/200312/2/2003PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie second floor column 1hr sheetrock rappes 12/2/2003 4:54:56 PM
BLD-Framing/Rough-in12/1/200312/1/200312/1/2003PFAIL
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie shaft around piping in stair towers 12/1/2003 2:39:46 PM
BLD-Framing/Rough-in11/18/200311/19/200311/19/2003APART
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes mec shaft and 2hr wall on 4th floor 11/19/2003 12:55:10 PM
BLD-Energy code compliance11/12/200311/13/200311/13/2003ACANC
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in11/13/200311/13/200311/13/2003PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore 2nd floor columns ok to cover also ok to start covering thier floor ext wall columns and walls alley side 11/13/2003 2:37:06 PM
BLD-Conference11/10/200311/12/200311/12/2003ACANC
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes out of time 11/12/2003 1:56:12 PM
FIRE-Conference11/12/200311/12/200311/12/2003PPART
DetailsRick Jackson
met with GC and Dave Hannah about shell sign-off and third floor occupancy; they will need to get approval from Dave Miller for temp if needed
BLD-Framing/Rough-in11/6/200311/7/200311/7/2003APART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie framing for hard lids bathrooms and ramp into basement also columns on third floor ok to cover int 11/7/2003 1:57:24 PM
BLD-Framing/Rough-in10/8/200310/9/200310/9/2003ADONE
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in10/9/200310/9/200310/9/2003PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore 2rd floor bath rooms walls ok to cover 10/9/2003 1:19:14 PM
BLD-Framing/Rough-in9/30/200310/1/200310/1/2003APART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to insulate 3rd floor ext walls 10/1/2003 11:01:59 AM
BLD-Framing/Rough-in9/24/20039/25/20039/25/2003APART
DetailsDave Hannah
mike- ###-#### looked at steel studs ok to cover storage rooms in basement 9/25/2003 1:38:41 PM
BLD-Framing/Rough-in9/24/20039/24/20039/24/2003PPART
DetailsDave Hannah
mike- ###-#### on site but no one here 9/24/2003 7:59:30 PM
BLD-Framing/Rough-in6/26/20036/27/20036/27/2003PPART
DetailsCarl Dependahl
mike...rec'd reports, wip....need clarify fire rating of occ sep. 6/27/2003 2:25:57 PM
BLD-Conference6/25/20036/26/20036/26/2003APASS
DetailsCarl Dependahl
rec'd spray-on 6/26/2003 11:27:00 AM rec'd spray-on f.p. detail, need all specs 6/26/2003 11:27:00 AM 6/26/2003 11:27:35 AM
BLD-Conference6/25/20036/26/20036/26/2003PPASS
DetailsCarl Dependahl
ok to substitute DCF for cafco300 as fire proof mat'l. 6/27/2003 6:24:03 PM
BLD-Conference6/25/20036/25/20036/25/2003PCANC
DetailsCarl Dependahl
###-####
BLD-Conference6/25/20036/25/20036/25/2003ACANC
DetailsCarl Dependahl
Mike
BLD-Conference6/24/20036/25/20036/25/2003ANR
DetailsCarl Dependahl
mike ; Phone #: ###-#### Internet Inspection Request from: Annette Moore...need TOW detailed. 6/25/2003 4:40:42 PM 6/25/2003 4:42:01 PM
BLD-Conference6/24/20036/24/20036/24/2003PPASS
DetailsCarl Dependahl
mike; re: T.O.W. assys at rated lid...install per detail 6/24/2003 2:17:47 PM
BLD-Conference5/19/20035/20/20035/20/2003PPART
DetailsCarl Dependahl
WIP; advised Mike Mason & MTI that city not getting insp reports...masonry wip. 5/20/2003 1:05:58 PM
BLD-Footing3/12/20033/13/20033/13/2003APART
DetailsTom Arcoraci
###-#### spec insp 3/13/2003 9:14:50 AM
BLD-Conference3/12/20033/12/20033/12/2003APASS
DetailsCarl Dependahl
W/ Mike Mason, Jordan-Wilcomb supt...need city insp requests & all spec insp doc's for project . No reports have been rec'd by me at this time, WIP