Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-02149
StatusFinaled
Name RA SCHULTZ AND COMPANY
Site Address 413 W IDAHO ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(IDAHO DEPT OF LABOR)(12/6/02 - UPGRADE AGREEMENT ATTACHED TO PLANS & ELECTRONICALLY TO PERMIT) To remodel 4,679 sq.ft. of area in the basement for new office tenant per approved plans on file. Work to include selective demolition of interior walls; construction of new W12 x 14 structural support beam, new interior walls to create new open office area and 3 new private office areas and new break room; to infill door openings between rooms with matching construction and modify two existing restrooms for full accessiblity compliance; to complete 1-hour floor/ceiling system between basement level and 1st floor per section 712 UBC and supporting columns & beams; to upgrade electrical & plumbing to meet tenant needs and provide compliance with current adopted codes; to modify the exit system to include doors, hardware, stairs / headroom, and handrails at stairs and ramp to meet current code. To change-out doors & windows in the south & west wall of this first level to 3/4 hour fire-resistive assemblies due to proximity to property lines. All per red-lined notes and attached plan review comments / conditions as part of the approved plans requiring compliance for final occupancy & use of this tenant space. An "Egress Easement" between 413 W. Idaho and 122 N. 5th and an "Upgrade Agreement" for 3/4-hour opening protection assemblies at the south and west sides of 2nd & 3rd levels are to be recorded against the properties before final occupancy and issuance of a Certificate of Occupancy is allowed. PC#02-566/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/20/20054/20/20054/20/2005 PASS
DetailsDave Hannah
BLD-Conference4/20/20054/20/20054/20/2005APASS
DetailsDave Hannah
all exit signs installed ok for perm occ 4/20/2005 9:48:48 AM
Permanent Occupancy 4/20/20054/20/2005 DONE
Details
BLD-Conference7/21/20047/21/20047/21/2004PCANC
DetailsDave Hannah
BLD-Conference5/4/20045/5/20045/5/2004ADONE
DetailsDave Hannah
BLD-Conference4/30/20045/4/20045/4/2004ACANC
DetailsDave Hannah
BLD-Conference3/3/20044/30/20044/30/2004ADONE
DetailsDave Hannah
call pat mckegan at ###-#### 4/30/2004 11:19:12 AM
BLD-Final3/2/20043/2/20043/2/2004PFAIL
DetailsDave Hannah
Cathy has the card - pleasse see additional comments from Dan Stuart in the activities. Thanks!
BLD-Conference9/16/20039/17/20039/17/2003ADONE
DetailsDave Hannah
meeting at 10:00 am on site patric
BLD-Final5/30/20035/30/20035/30/2003PNR
DetailsCarl Dependahl
richard; Phone #: ###-#### Internet Inspection Request from: Barbara Moore has plbg c/n...extend t/o until issues resolved or 90 days 5/30/2003 2:37:17 PM
BLD-Final3/10/20033/11/20033/11/2003ACANC
DetailsCarl Dependahl
out of time.
BLD-Final3/11/20033/11/20033/11/2003PPART
DetailsCarl Dependahl
c/n...need clarify intent of p.c. notes...all upper floors to comply w/IBC for exits, illumination, etc... 3/11/2003 3:36:14 PM 3/11/2003 3:37:43 PM
BLD-Final3/10/20033/10/20033/10/2003PFAIL
DetailsJim Storey
JACK; Phone #: ###-#### Internet Inspection Request from: Darla Downs cloned out of time. 3/10/2003 4:51:21 PM
FIRE-Final Inspection3/7/20033/10/20033/10/2003APASS
DetailsRick Jackson
###-####
FIRE-Final Inspection3/4/20033/5/20033/5/2003AFAIL
DetailsRick Jackson
JACK; Phone #: ###-#### Internet Inspection Request from: Darla Downs exit signs on south side of building not shown on plans as this isn't part of required exiting - they will have to be removed or hardware and exit height by door 3 to comply; emergency light not working by door 14 3/5/2003 10:37:12 AM
BLD-Framing/Rough-in2/21/20032/24/20032/24/2003APART
DetailsCarl Dependahl
ceiling insp- jack ###-####...grid ok 2/24/2003 5:54:59 PM
BLD-Conference2/14/20032/14/20032/14/2003PPASS
DetailsCarl Dependahl
w/ bldr...7' headroom allowed at all exit paths 2/14/2003 3:28:52 PM
BLD-Framing/Rough-in1/7/20031/7/20031/7/2003PPASS
DetailsJim Storey
jack; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n made ok ok to rock. 1/7/2003 3:28:55 PM
BLD-Framing/Rough-in1/7/20031/7/20031/7/2003PPASS
DetailsJim Storey
jack; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n made ok ok to rock. 1/7/2003 3:28:55 PM
BLD-Framing/Rough-in12/31/20021/2/20031/2/2003AFAIL
DetailsDave Hannah
jack; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs fire blocking between walls and ceiling also needs engineer to clarify how and were he needs addional floor jiost 1/2/2003 11:48:19 AM
BLD-Conference7/26/20047/26/2004 P 
DetailsDave Hannah