Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-02250
StatusFinaled
Name ROTH HOMES
Site Address 5257 E BARBER STATION WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, two and half bathroom 1825 sq. ft. two story single family dwelling (918 sq. ft. first floor/907 sq. ft. second floor) with a attached 644 sq. ft. two car garage and a 149 sq. ft. covered front porch. Per approved plans, engineering and requirement list. CUP98-116 and CUP01-103 per Angie Thomas with Planning and Zoning. PC#537 (SAM) 10/1/02 GARAGE CHANGED from a two car garage to a attached 820 sq. ft. three car garage. Per approved plans and red-lining. (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/11/20033/13/20033/13/2003APASS
DetailsDave Hannah
Josh, ###-#### c.c # 23798 issued 3/13/2003 9:29:22 AM
BLD-Final3/7/20033/7/20033/7/2003PFAIL
DetailsDave Hannah
Josh, ###-#### c/n on site 3/7/2003 3:23:12 PM
BLD-Energy code compliance12/23/200212/24/200212/24/2002PPASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: alan gossi ok to cover 12/24/2002 3:17:56 PM
BLD-Framing/Rough-in12/19/200212/20/200212/20/2002PFAIL
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: alan gossi ok to insulate after plumbing r/i aproval 12/20/2002 2:18:12 PM
BLD-Wall cover12/6/200212/6/200212/6/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/06/2002 at 09:49:01. Contact: ###-####. shear ok to cover ext 12/6/2002 3:56:23 PM
BLD-Wall cover12/3/200212/4/200212/4/2002AFAIL
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: alan gossi no city aproved plans on site 12/4/2002 8:35:59 AM
BLD-Wall cover12/4/200212/4/200212/4/2002PFAIL
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: alan gossi every thing ok but for six floor to floor mst36 straps on front of house 12/4/2002 2:50:15 PM
BLD-Foundation10/7/200210/8/200210/8/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/07/2002 at 19:24:58. Contact: ###-####.work in progress about 25% complete 10/8/2002 10:53:12 AM
BLD-Footing10/7/200210/7/200210/7/2002PPART
DetailsSteven Webb
###-#### wip-5% ready 10/7/2002 3:09:46 PM