(HP B25, Data Center Reliability Upgrade) To perform selective demolition of masonry wall & roof areas at existing north side generator rooms in preparation for new construction to create a 1000 s.f. addition to house a new west switchgear room (Rm. 02) and to install a new east side switchgear room (Rm. 191) within a portion of existing generator room (Rm. 187). To modify room use of Rms. 141 & 143 to storage. To add 3 new enclosed generator pads; a new transformer enclosure; new reinforced masonry walls, roof structure, utility bridge & support, interior non-bearing / non-combustible wall; exterior landings, stairs & railings; and sprinkler, alarm, electrical, mechanical and plumbing upgrades to meet tenant needs and meet code compliance. NOTE: This building is fully sprinklered for allowable area increase. Existing 2-hr. Area separation wall & 1-hr. occ. separation wall to be maintained. SPECIAL INPSECTION REQUIRED, See sheet 'S0.1'. DRH02-150; PC#620-02/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/7/200311/7/200311/7/2003PPASS
DetailsTom Arcoraci
JASON; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm 11/7/2003 2:23:59 PM
BLD-Final10/29/200310/29/200310/29/2003PFAIL
DetailsRuss Owen
jason; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need 1 hr assemblies for penetrations of 1 hr wall at generator room c/n. ok for a temp oc, all equired signatures are on card.r 10/29/2003 12:09:07 AM 10/29/2003 12:09:37 AM
Code Occupancy Approval  10/29/2003 PASS
OK FINAL SIGNED OFF.
BLD-Final10/27/200310/28/200310/28/2003PNR
DetailsJim Sly
Matt; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Tried to call Matt......must be wrong # ? 10/28/2003 4:24:19 PM
BLD-Final10/24/200310/27/200310/27/2003ACANC
DetailsJim Sly
jason; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need all req signatures ie. Public W and zoning...... 10/27/2003 12:28:38 PM
BLD-Final10/23/200310/24/200310/24/2003AFAIL
DetailsJim Sly
Jason; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need all req signatures. 10/24/2003 1:46:40 PM
FIRE-Final Inspection10/23/200310/24/200310/24/2003APASS
DetailsTroy Cobbley
fire life safety finaled 10/24/2003 10:04:47 AM
BLD-Wall cover10/7/200310/8/200310/8/2003AFAIL
DetailsJim Sly
###-#### maTT west side of 126 Called Matt.......Not aware of any wall cover insp req at this time....should have been Electrical ?...... 10/8/2003 11:20:28 AM
BLD-Final9/3/20039/4/20039/4/2003ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/3/2003 at 9:06:14 AM. Contact: ###-####. Betw 5mi MG on franklin N Bethel. 9/4/2003 8:44:57 AM
FIRE-Final Inspection9/3/20039/4/20039/4/2003AFAIL
DetailsTroy Cobbley
Provide fire extinguishers in the generator rooms per review note #11, finish painting of the curbing for fire dept access per review note #7 and conversation, repair emergency light in room 002 and raise the existing fire hydrant so the barrel is a min. 18" above finish grade per United Water requirements 9/4/2003 11:43:48 AM
BLD-Foundation12/3/200212/4/200212/4/2002APART
DetailsRuss Owen
###-####wall in ele room 12/4/2002 5:52:04 PM
BLD-Footing11/4/200211/6/200211/6/2002PPART
DetailsRuss Owen
rebar; Phone #: ###-#### Internet Inspection Request from: Rita DeYoungok subject to s-i. 11/6/2002 5:07:04 PM