Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-02321
StatusExpired
Name PANDA EXPRESS
Site Address 1124 N MILWAUKEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(PANDA EXPRESS) To construct a new 1,810 sq.ft. (B) occupancy restaurant tenant space in existing shell building done under BLD02-01851 per approved plans on file. Work to include structural roof modifications to support additional rooftop equipment, two new accessible restrooms, new interior walls and doors, interior finish, new suspended ceiling, new soffit work, new walk-in cooler and freezer installations, (2) new Type I hood installations with one-hour rated duct enclosures, new mechanical work including all new rooftop equipment, new plumbing work, and new electrical work. One-hour rated tenant demising wall is existing from the shell building permit. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is NOT fire sprinklered. (PC#0626-02) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 12/20/200312/20/2003 DONE
Details
Code Occupancy Approval  1/10/2003 PASS
ALL LAND SCAPE IN OK FOR FINAL AND RELEASE OF BOND.
BLD-Final12/19/200212/20/200212/20/2002PPART
DetailsRuss Owen
###-####. ok for a temp oc , pending all required signatures for a permanent. 12/20/2002 12:58:07 PM
FIRE-Final Inspection12/19/200212/20/200212/20/2002APASS
DetailsTroy Cobbley
life safety finaled 12/20/2002 10:57:20 AM
FIRE-Final Inspection12/18/200212/19/200212/19/2002PFAIL
DetailsTroy Cobbley
hood system tested ok. the only thing missing is the actual permit and the specifications. Also needs life safety inspection 12/19/2002 1:17:15 PM
BLD-Framing/Rough-in12/18/200212/18/200212/18/2002PPASS
DetailsRuss Owen
CEILING GRID; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok for tile. 12/18/2002 1:27:49 PM
BLD-Framing/Rough-in12/17/200212/17/200212/17/2002PFAIL
DetailsRuss Owen
CEILING GRID- GORDON ; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliec/n posted 12/17/2002 5:04:39 PM
BLD-Other12/16/200212/16/200212/16/2002PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/16/2002 at 10:24:40. Contact: ###-####.c/n for perim wires. 12/16/2002 2:35:03 PM
FIRE-Conference12/12/200212/13/200212/13/2002ADONE
DetailsTroy Cobbley
I spoke with the contractor and the electrical contractor about the placement for the duct smoke detectors and electrical shutoff under the type 1 hood 12/13/2002 9:40:40 AM
BLD-Framing/Rough-in11/21/200211/22/200211/22/2002PPASS
DetailsRuss Owen
gordon ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in11/20/200211/21/200211/21/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/20/2002 at 14:44:44. Contact: ###-####. need trades ok'd, resubmit for duct wrap; ok to pre rock behind elec panels, etc 11/21/02 11:15:32 AM