(Building Area "B"New Church) * To construct a new 26,050 sq.ft. single story, sanctuary, restroom and entry vestibule. NOTE: This building is fully fire sprinklered for one-hour substitution. This permit includes if accepted aternate #2 to "Area A", demo entry, modify existing exterior wall and make a two-hour separation wall and connect "Area A & Area B" via an new entry lobby. All construction per the approved plans and attached comment list. Refer to BLD 02-02667 for remodel of Area "A". See BLD 02 -02236 for grading permit. * PLAN MODIFICATION 5/22/03 * To complete to front facade of building "A" with this permit and to include remodel of lobby area add storage rooms and enlagre offices space as noted on plans dated 5/22/03. MJP PC#652-02 CUP02-00038
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/21/20041/21/20041/21/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 1/21/2004 at 7:05:37 AM. Contact: ###-####. OK for Perm Occ. :) 1/21/2004 3:13:19 PM
FIRE-Final Inspection1/20/20041/21/20041/21/2004APASS
DetailsTroy Cobbley
Fire life safety, fire alarm and fire sprinklers finaled 1/21/2004 11:23:09 AM
FIRE-Final Inspection1/20/20041/21/20041/21/2004PCANC
DetailsTroy Cobbley
duplicate inspection 1/21/2004 11:24:04 AM
Permanent Occupancy 1/15/20041/15/2004 DONE
Details
BLD-Other1/13/20041/14/20041/14/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 1/13/2004 at 9:03:51 AM. Contact: ###-####. Grid in alternate OK 1/15/2004 8:07:26 AM
BLD-Other12/23/200312/24/200312/24/2003ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/23/2003 at 1:47:54 PM. Contact: ###-####.
BLD-Final12/22/200312/23/200312/23/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/22/2003 at 9:13:59 AM. Contact: ###-####. Temp Occ. OK for Sanctuary (Bldg B) Verified approval from Dave Miller over the phone. 12/23/2003 4:09:23 PM 12/23/2003 4:14:38 PM
FIRE-Final Inspection12/22/200312/23/200312/23/2003PPART
DetailsTroy Cobbley
A temporary occupancy was given with dave millers permission until the existing building is completed. Battery calcs, map, breaker locks and breaker box location. Existing building needs to be inspected 12/23/2003 1:23:58 PM
FIRE-Final Inspection12/22/200312/22/200312/22/2003PFAIL
DetailsTroy Cobbley
provide "no parking fire lane" text on the fire lane curbing, install door hardware and building address, secure new area from the existing area before a temp occupancy is signed 12/22/2003 4:12:08 PM
BLD-Wall cover12/10/200312/11/200312/11/2003APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/10/2003 at 10:35:14 AM. Contact: ###-####. Ceiling grid OK. 12/11/2003 11:19:36 AM
BLD-Wall cover10/21/200310/21/200310/21/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/21/2003 at 7:11:08 AM. Contact: ###-####. Need details and listed assemblies for type v1hr alternate. 10/21/2003 4:29:16 PM
BLD-Wall cover10/17/200310/20/200310/20/2003PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/17/2003 at 9:25:09 AM. Contact: ###-####.
BLD-Conference10/7/200310/8/200310/8/2003ADONE
DetailsJim Sly
per your request
BLD-Framing/Rough-in9/5/20039/8/20039/8/2003APART
DetailsJim Sly
BRIAN; Phone #: ###-#### Internet Inspection Request from: Marc Lileks Looked at wood framing in Alternate section.....Archit to address V 1hr at ceiling this area. 9/8/2003 10:11:39 AM
BLD-Framing/Rough-in7/23/20037/24/20037/24/2003APART
DetailsJim Sly
###-#### bryaN Conf on Work in progress. 7/24/2003 9:40:03 AM
BLD-Conference5/14/20035/15/20035/15/2003AFAIL
DetailsJim Sly
brian; Phone #: ###-#### Internet Inspection Request from: Annette Moore Architect to resubmit changes for plan modification review for alternate area. 5/15/2003 12:15:08 PM
BLD-Footing5/2/20035/5/20035/5/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 5/2/2003 at 4:17:31 PM. Contact: ###-####. Footings at alternate sections 2 and 5 OK pending MTI insp and approvals. 5/5/2003 2:35:38 PM
BLD-Footing4/29/20034/30/20034/30/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/29/2003 at 12:19:23 PM. Contact: ###-####. Footing at South wall connecting New to old Bldg......OK pending MTI spec insp and approvals. 4/30/2003 9:16:21 AM
BLD-Footing4/7/20034/8/20034/8/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/7/2003 at 12:08:02 PM. Contact: ###-####. Footing (pads) at N.W. corner of new Bldg. OK pend Special insp and appr. 4/8/2003 2:58:29 PM
BLD-Footing3/19/20033/20/20033/20/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/19/2003 at 4:24:19 PM. Contact: ###-####. Last of the foundation...OK Pending MTI insp and approvals. 3/20/2003 3:41:07 PM
BLD-Footing3/12/20033/13/20033/13/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/12/2003 at 9:33:12 AM. Contact: ###-####. Footing for bell tower, S. E. section (using as drive thru) and Misc pads OK pending MTI insp and approvals. 3/13/2003 3:21:50 PM
BLD-Footing3/7/20033/10/20033/10/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/7/2003 at 9:01:44 AM. Contact: ###-####. OK pend MTI insp and appr. 3/10/2003 4:49:20 PM
BLD-Footing3/6/20033/6/20033/6/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/6/2003 at 7:54:53 AM. Contact: ###-####. West part of South wall..... OK pending MTI insp and approvals. 3/6/2003 12:27:29 PM
BLD-Footing3/3/20033/4/20033/4/2003PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/3/2003 at 12:48:24 PM. Contact: ###-####. MTI insp and approvals. 3/4/2003 3:54:41 PM
BLD-Footing2/27/20032/28/20032/28/2003APART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Columns at West wall and footings (for columns) at North wall near bell tower. OK pending MTI insp and approvals. 2/28/2003 3:05:53 PM
BLD-Footing2/24/20032/25/20032/25/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/24/2003 at 1:06:19 PM. Contact: ###-####. MTI 2/25/2003 10:35:38 AM
BLD-Foundation2/20/20032/21/20032/21/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/20/2003 at 12:34:02 PM. Contact: ###-####. Found wall for west end and large pads for columns and large beams spanning sanctuary. OK pend insp and appr MTI. 2/21/2003 10:36:34 AM
BLD-Foundation2/18/20032/19/20032/19/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/18/2003 at 7:08:28 AM. Contact: ###-####. OK pend. MTI insp and appr. 2/19/2003 10:16:06 AM
BLD-Footing2/14/20032/18/20032/18/2003APART
DetailsTom Arcoraci
BRIAN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Foundation2/13/20032/14/20032/14/2003PPART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Octagon wall (East) MTI on site. 2/14/2003 4:15:21 PM
BLD-Footing2/11/20032/12/20032/12/2003PPART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung East wall footings OK pending special insp and approval....(MTI) 2/12/2003 3:36:38 PM
BLD-Foundation2/5/20032/6/20032/6/2003APART
DetailsJim Sly
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Part of the Footings were poured on an MIS permit for Early start......MTI has been on site full time for all footings.....Have finaled MIS permit. 2/6/2003 9:49:38 AM