Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-02495
StatusFinaled
Name HIGH DESERT CONSTRUCTION
Site Address 2179 S WHITE PINE PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, three bathroom 3018 sq. ft. two story single family dwelling (1850 sq. ft. first floor/1168 sq. ft. second floor) with a attached 694 sq. ft. two car garage and a 466 sq. ft. covered front deck. Per approved plans, engineering and requirement list. PC#626 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/8/20034/9/20034/9/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/8/2003 at 4:48:50 PM. Contact: ###-####.
BLD-Final4/7/20034/8/20034/8/2003PNH
DetailsJim Storey
kevin please call for access; Phone #: ###-#### Internet Inspection Request from: Annette Moore called no responce for access. 4/8/2003 4:38:23 PM
BLD-Final4/2/20034/3/20034/3/2003PCANC
DetailsJim Storey
call for access code ###-#### called and cancled 4/3/2003 9:41:45 AM
BLD-Footing1/14/20031/15/20031/15/2003APASS
DetailsJim Storey
kevin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n made ok 1/15/2003 8:14:38 AM
BLD-Energy code compliance1/3/20031/6/20031/6/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/03/2003 at 12:24:42. Contact: ###-####. ft at front porch stil missing needs insp. 1/6/2003 3:15:20 PM
BLD-Energy code compliance1/2/20031/3/20031/3/2003ANR
DetailsAlan Hauser
Scheduled by a contractor via Hello! on 01/02/2003 at 11:54:59. Contact: ###-####.
BLD-Wall cover1/3/20031/3/20031/3/2003APASS
DetailsAlan Hauser
BLD-Framing/Rough-in12/30/200212/31/200212/31/2002PFAIL
DetailsDave Hannah
kevin--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie truess ok but shear panels still not nailed per plans ok to insulate 1/2/2003 7:39:43 AM
BLD-Framing/Rough-in12/23/200212/24/200212/24/2002PNR
DetailsJim Storey
###-#### ###-####c/n 12/24/2002 1:50:57 PM
BLD-Foundation11/7/200211/8/200211/8/2002APART
DetailsSteven Webb
###-#### wip--5% ready at time of inspection. 11/8/2002 10:09:23 AM
BLD-Footing11/7/200211/7/200211/7/2002PPART
DetailsDave Hannah
###-#### jerad work in progress crew is checing with arc on rebar plans call for two in ftg and two in wall crew wants to use rebar only in walls with hold downs 11/7/2002 1:32:45 PM