Permit Number | BLD02-02584 |
Status | Finaled |
Name |
MK PLAZA 1 (SMOKE-CONTROL)
|
Site Address |
400 S BROADWAY AVE
|
Project Name | MK PLAZA I |
Customer Number | |
ePlanReview | No |
Description |
(MK PLAZA I) This building is fire sprinklered to mitigate the potential hazards of the atrium. To construct or upgrade passive smoke barriers throughout an existing 111,000 square foot building having 6 stories and a basement. The work shall be compatible with a report prepared by Michael E. Dillon, Professional Engineer, and approved by the Boise City Building Division. A non-essential (i.e. non-life-safety) mechanical smoke management system is also proposed. Work is to include smoke dampers, fire dampers, combination fire and smoke dampers, smoke doors, and smoke control at the elevator doors on the 4th floor. A smoke control panel will be provided to operate the non-essential smoke management system. The system will be manual operable only and is NOT required to comply with 1997 UBC Section 905. The fire sprinkler system shall be maintained in compliance with NFPA 13 as regulated by the Fire Department. **CJW**
|