BLD-Final | 9/23/2003 | 9/23/2003 | 9/23/2003 | P | PASS |
Jim Storey
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Final | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | NR |
Jim Storey
|
|
|
bryan ; Phone #: ###-#### Internet Inspection Request from: Annette Moore fire failed no insp. 9/19/2003 12:27:36 PM
|
BLD-Grading Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading is complete. Revegetation is not. For this incomplete work a $500.00 bond has been submitted. Therefore, the grading and drainage is conditionally approved.
|
FIRE-Final Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 | A | FAIL |
Troy Cobbley
|
|
|
I stopped at project by accident. The general contractor requested a final inspection since I was there. I could not because the fire sprinker system was not complete. I pointed out several deficiencies
|
BLD-Energy code compliance | 6/13/2003 | 6/13/2003 | 6/13/2003 | A | PASS |
Dave Hannah
|
|
|
ok to cover if fire sprinkler system is ok to cover
|
BLD-Framing/Rough-in | 6/12/2003 | 6/13/2003 | 6/13/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/12/2003 at 12:47:51 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/9/2003 | 6/10/2003 | 6/10/2003 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 4:56:07 PM. Contact: ###-####.c/n on sitew ok to insulate 6/10/2003 2:22:33 PM
|
BLD-Framing/Rough-in | 6/9/2003 | 6/9/2003 | 6/9/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 8:23:38 AM. Contact: ###-####. sear ok to cover ext 6/9/2003 10:07:00 PM
|
BLD-Framing/Rough-in | 6/5/2003 | 6/5/2003 | 6/5/2003 | P | FAIL |
Dave Hannah
|
|
|
###-#### mark no city aproved plans or truss engineering also needs seal package installed 6/5/2003 5:14:14 PM
|
BLD-Foundation | 3/19/2003 | 3/19/2003 | 3/19/2003 | P | PASS |
Dave Hannah
|
|
|
###-#### garage walls 3/19/2003 2:26:23 PM
|
BLD-Footing | 3/12/2003 | 3/13/2003 | 3/13/2003 | A | PASS |
Dave Hannah
|
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs ftgs for garage 3/13/2003 10:07:22 AM
|
BLD-Grading Inspection | 3/12/2003 | 3/12/2003 | 3/12/2003 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved footing subgrade for garage.
|
BLD-Footing | 2/18/2003 | 2/18/2003 | 2/18/2003 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/18/2003 at 7:23:55 AM. Contact: ###-####.
|
BLD-Foundation | 1/15/2003 | 1/15/2003 | 1/15/2003 | P | PART |
Dave Hannah
|
|
|
###-#### jim work in progress rebar in forms up on basement area 1/15/2003 3:17:59 PM
|
BLD-Footing | 1/6/2003 | 1/7/2003 | 1/7/2003 | A | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 1/7/2003 | 1/7/2003 | 1/7/2003 | P | PART |
Dave Hannah
|
|
|
###-#### bottom half 1/7/2003 4:18:28 PM
|
BLD-Grading Inspection | 1/2/2003 | 1/2/2003 | 1/2/2003 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the subgrade for the main portion of the house. The garage footing will be done later.
|