BLD-Final | 11/4/2003 | 11/5/2003 | 11/5/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/4/2003 at 3:25:30 PM. Contact: ###-####. ok for c.c
11/5/2003 9:41:18 AM
|
BLD-Final | 11/3/2003 | 11/3/2003 | 11/3/2003 | P | NR |
Dave Hannah
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Other | 9/11/2003 | 9/12/2003 | 9/12/2003 | A | CANC |
Dave Hannah
|
|
|
char storm drain inspect; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 8/15/2003 | 8/15/2003 | 8/15/2003 | P | NR |
Carl Dependahl
|
|
|
still on bond 8/15/2003 4:16:19 PM
|
BLD-Final | 7/31/2003 | 8/1/2003 | 8/1/2003 | P | PART |
Carl Dependahl
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...ok for t/o, need P&Z final, signage, complete ext wall insulation/vapor barrier; rec'd eng's affidavit ok 8/1/2003 5:47:22 PM
|
FIRE-Final Inspection | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PASS |
Rick Jackson
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 7/31/2003 | 7/31/2003 | 7/31/2003 | P | PART |
Carl Dependahl
|
|
|
###-####...riser room framing( for 1hr ) 7/31/2003 6:24:16 PM
|
BLD-Final | 7/29/2003 | 7/30/2003 | 7/30/2003 | P | NR |
Carl Dependahl
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIRE-Final Inspection | 7/28/2003 | 7/30/2003 | 7/30/2003 | A | FAIL |
Rick Jackson
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need alarm map at panel; complete sprinkler (see sprinkler permit); exit signs on second floor; need one hour sprinkler room; knox box needed; 7/30/2003 11:48:16 AM
|
BLD-Framing/Rough-in | 7/15/2003 | 7/16/2003 | 7/16/2003 | A | PART |
Carl Dependahl
|
|
|
###-#### tim ceiling grid...ok to tile corridor. 7/16/2003 10:03:50 AM
|
BLD-Framing/Rough-in | 7/15/2003 | 7/15/2003 | 7/15/2003 | P | NR |
Carl Dependahl
|
|
|
ceiling grid- tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 6/23/2003 | 6/23/2003 | 6/23/2003 | P | PART |
Carl Dependahl
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...suspended corridor lid ok, lights tented at lobby. 6/23/2003 5:01:40 PM
|
BLD-Conference | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | PASS |
Carl Dependahl
|
|
|
still need all appropriate spec insp reports...ok to continue. 6/18/2003 9:09:40 AM
|
BLD-Framing/Rough-in | 6/16/2003 | 6/17/2003 | 6/17/2003 | A | PART |
Carl Dependahl
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore...susp lid at corridor ok...seal firestop at bulkheads at lobby for 1hr wall const....s/f damper to be installed at 1 hvac duct at lobby. 6/17/2003 2:01:37 PM
|
BLD-Framing/Rough-in | 6/16/2003 | 6/16/2003 | 6/16/2003 | P | NR |
Carl Dependahl
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 6/3/2003 | 6/4/2003 | 6/4/2003 | A | NR |
Carl Dependahl
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 6/4/2003 | 6/4/2003 | 6/4/2003 | P | PART |
Carl Dependahl
|
|
|
add full ht gyp at corridors, chk. at ceiling insp...ok to continue 6/4/2003 3:50:17 PM
|
BLD-Framing/Rough-in | 5/28/2003 | 5/29/2003 | 5/29/2003 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to cover walls 5/29/2003 9:52:53 AM
|
BLD-Framing/Rough-in | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | FAIL |
Carl Dependahl
|
|
|
###-####, c/n firestops, add backing studs at corridor...seal "tops" of chases, provide arch's detail for susp. lids & shaft wall 5/28/2003 12:17:35 PM
|
BLD-Conference | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | PASS |
Carl Dependahl
|
|
|
kim-- ###-#### ...w/ arch onsite, submit details for approved 1 or 2 hr suspended clg & shaft wall assy along corridor at 2nd fl...1 layer lid ok per GA or ICBO T-&-C, item 6-4.1. 5/15/2003 11:50:31 AM
|
BLD-Framing/Rough-in | 5/12/2003 | 5/13/2003 | 5/13/2003 | A | NR |
Carl Dependahl
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore, need Mti's reports for welding, steel connections, etc. Need arch's detail for tunnel corridors near duct chases...unable to meet details as drawn 5/13/2003 1:38:16 PM
|
BLD-Framing/Rough-in | 4/7/2003 | 4/8/2003 | 4/8/2003 | P | PART |
Steven Webb
|
|
|
kim; Phone #: ###-#### Internet Inspection Request from: Annette Moore Floor deck--ok pending approval from special inspector on all welds, bar, wire mesh, etc. 4/8/2003 3:00:30 PM
|
BLD-Foundation | 3/21/2003 | 3/21/2003 | 3/21/2003 | P | PART |
Russ Owen
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Ok pending special inspection. 3/21/2003 3:55:39 PM
|
BLD-Framing/Rough-in | 3/17/2003 | 3/18/2003 | 3/18/2003 | A | PART |
Carl Dependahl
|
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs; NOT FRAME INSP; Met MTI insp. Eric ,Proj. Mgr. Lee Harrison & Tim Sparks onsite,, wip, pending reports for fabbed steel components and assembly, masonry, and concrete 3/18/2003 10:37:27 AM
|
BLD-Foundation | 3/14/2003 | 3/14/2003 | 3/14/2003 | P | PART |
Carl Dependahl
|
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs...pend insp report 3/17/2003 5:32:27 PM
|
BLD-Framing/Rough-in | 3/12/2003 | 3/13/2003 | 3/13/2003 | A | PART |
Dave Hannah
|
|
|
kim; Phone #: ###-#### Internet Inspection Request from: Annette Moore . CMU walls MTI on site to do spec inspection walked project with inspector 3/13/2003 11:22:52 AM
|
BLD-Footing | 2/25/2003 | 2/25/2003 | 2/25/2003 | P | PART |
Jim Sly
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Grade Beams OK pending MTI insp and approval. 2/25/2003 2:21:18 PM
|
BLD-Footing | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PART |
Carl Dependahl
|
|
|
ft insp tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Pending MTI's report, ok 2/24/2003 5:02:02 PM
|
BLD-Footing | 2/20/2003 | 2/21/2003 | 2/21/2003 | A | PASS |
Tom Arcoraci
|
|
|
###-#### tim pen 2/21/2003 10:17:14 AM pending mti report 2/21/2003 10:17:51 AM
|
BLD-Conference | 2/14/2003 | 2/14/2003 | 2/14/2003 | P | PASS |
Carl Dependahl
|
|
|
fdn wip...awaiting MTI's report. 2/14/2003 2:47:25 PM
|
BLD-Footing | 2/12/2003 | 2/13/2003 | 2/13/2003 | A | PART |
Dave Hannah
|
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie` 2/12/2003 1:20:14 PM crew is is going to pour ftgs on the north and south sides will uae M.T.I. for spec insp pbl works schedu;led for this after noon to go over run off water 2/13/2003 9:21:36 AM
|
BLD-Other | 2/4/2003 | 2/6/2003 | 2/6/2003 | P | NR |
Carl Dependahl
|
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs NEEDS DRAIN INSPECTION... site drainage req's Pub. Wks. 2/6/2003 2:37:30 PM
|