BLD-Final | 2/6/2004 | 2/6/2004 | 2/6/2004 | P | PASS |
Dave Hannah
|
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for prem occ 2/6/2004 2:16:13 PM
|
Permanent Occupancy | | 2/6/2004 | 2/6/2004 | | DONE |
|
|
|
|
BLD-Final | 1/30/2004 | 1/30/2004 | 1/30/2004 | P | CANC |
Dave Hannah
|
|
|
kevin ; Phone #: ###-#### Internet Inspection Request from: Annette Moore--not ready yet
|
FIRE-Final Inspection | 1/29/2004 | 1/30/2004 | 1/30/2004 | P | PASS |
Rick Jackson
|
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Annette Moore fire/life safety okay 1/30/2004 9:37:36 AM
|
FIRE-Supply Line Hydro | 1/29/2004 | 1/30/2004 | 1/30/2004 | P | PASS |
Rick Jackson
|
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Annette Moore final okay 1/30/2004 9:31:40 AM
|
FIRE-Final Inspection | 1/23/2004 | 1/23/2004 | 1/23/2004 | A | FAIL |
Rick Jackson
|
|
|
need exit signs as shown on plans for second floor; repair exit sign on second floor at SW exit stair (needs battery backup); need occupant load sign in room 139; lever hardware on stair/exit doors; clear stairs of materials; smoke seals on stair doors;eed fire extinguishers throughout; need signs on riser room and FACP room doors 1/23/2004 9:03:19 AM
|
BLD-Final | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | PART |
Dave Hannah
|
|
|
partial occ- larry ###-#### 3rd floor north half ok to move into 12/22/2003 3:39:35 PM
|
FIRE-Final Inspection | 12/22/2003 | 12/22/2003 | 12/22/2003 | P | NR |
Rick Jackson
|
|
|
will need to verify emergency lighting to occupy the north half of the 3rd floor as part of phasing this project 12/22/2003 2:59:55 PM
|
FIRE-Final Inspection | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | PART |
Rick Jackson
|
|
|
###-#### larry phased project: okay to occupy the second floor on the north side 12/8/2003 2:48:48 PM
|
FIRE-Conference | 12/5/2003 | 12/5/2003 | 12/5/2003 | A | PART |
Rick Jackson
|
|
|
met with Larry and the need for emergency lights on the second floor north side 12/5/2003 10:53:30 AM
|
BLD-Conference | 11/25/2003 | 11/26/2003 | 11/26/2003 | A | DONE |
Dave Hannah
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 11/11/2003 | 11/12/2003 | 11/12/2003 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/11/2003 at 10:54:01 AM. Contact: ###-####.
|
BLD-Conference | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | DONE |
Dave Hannah
|
|
|
###-#### larry talked about location of smoke curtions and stair risers 11/12/2003 2:16:49 PM
|
BLD-Wall cover | 11/6/2003 | 11/7/2003 | 11/6/2003 | P | CANC |
Dave Hannah
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Conference | 11/3/2003 | 11/3/2003 | 11/3/2003 | A | PART |
Dave Hannah
|
|
|
draft stops between sec and third floor not needed becouse of being fully fire sprinklerd
|
BLD-Final | 10/31/2003 | 11/3/2003 | 11/3/2003 | A | NR |
Dave Hannah
|
|
|
Larry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Conference | 10/28/2003 | 10/29/2003 | 10/29/2003 | A | PART |
Dave Hannah
|
|
|
Larry//after 8:30; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes temp glass for smoke sheilds 10/29/2003 1:21:46 AM
|
FIRE-Conference | 10/16/2003 | 10/17/2003 | 10/17/2003 | P | PART |
Rick Jackson
|
|
|
colyn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore phased project and okay to occupy the north side of the first floor; stairways to remain clear of debris, etc 10/17/2003 4:02:21 PM
|
BLD-Framing/Rough-in | 10/9/2003 | 10/9/2003 | 10/9/2003 | P | PART |
Dave Hannah
|
|
|
larry celing; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to drop in pannels 10/9/2003 2:27:44 PM
|
BLD-Framing/Rough-in | 9/26/2003 | 9/26/2003 | 9/26/2003 | P | PART |
Dave Hannah
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Darla Downs under floor space bathroom filled solid with insulation 9/26/2003 2:19:07 PM
|
BLD-Conference | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | DONE |
Dave Hannah
|
|
|
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Wall cover | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | PASS |
Tom Arcoraci
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Marc Lileks discussed some hand rail issues ok for short ext at some locations 8/22/2003 10:03:07 AM
|
BLD-Framing/Rough-in | 8/20/2003 | 8/21/2003 | 8/21/2003 | A | PART |
Carl Dependahl
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover 1st fl, dampers installed at shaft. 8/21/2003 2:37:45 PM
|
BLD-Framing/Rough-in | 8/1/2003 | 8/4/2003 | 8/4/2003 | A | PART |
Carl Dependahl
|
|
|
###-####...panel box at rest room ok, if ok w/ elec insp....existing wall....file storage floor ok to cover 8/4/2003 11:16:03 AM
|
BLD-Conference | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | PASS |
Carl Dependahl
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore..install draft curtains, 18' or to 7' a.f.f. 7/31/2003 5:54:02 PM
|
BLD-Conference | 7/29/2003 | 7/30/2003 | 7/30/2003 | A | PASS |
Carl Dependahl
|
|
|
###-#### kirby ...need fire dampers at floor lines at chase; install per listing. 7/30/2003 2:45:31 PM
|
BLD-Conference | 7/15/2003 | 7/15/2003 | 7/15/2003 | P | PASS |
Carl Dependahl
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...need spec insp for welds; clarify smoke curtains... 7/15/2003 3:54:22 PM
|
BLD-Footing | 7/15/2003 | 7/15/2003 | 7/15/2003 | P | PART |
Carl Dependahl
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore isolated col ftgs at north 1/2 & strip ftgs at south 1/2 ok... 7/15/2003 3:53:25 PM
|