Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-02877
StatusFinaled
Name ROTH HOMES
Site Address 5260 E BARBER STATION WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two bathroom 1968 sq. ft. two story single family dwelling (1638 sq. ft. first floor/330 sq. ft. second floor) with a attached 572 sq. ft. two car garage, a 52 sq. ft. covered back porch and a 147 sq. ft. covered front porch. Per approved plans, engineering and requirement list. CUP98-116 and CUP01-103 per Angie Thomas with Planning and Zoning. PC#711 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/31/20037/31/20037/31/2003PPASS
DetailsDave Hannah
Access garage 0852 enter; Phone #: ###-#### Internet Inspection Request from: josh strasser c.c # 23951 issued 7/31/2003 2:02:13 PM
BLD-Final7/30/20037/30/20037/30/2003PCANC
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: josh strasser
BLD-Final7/29/20037/29/20037/29/2003PFAIL
DetailsDave Hannah
needs plumbing final and fire place final 7/29/2003 2:29:00 PM
BLD-Final7/23/20037/24/20037/24/2003PNH
DetailsSteven Webb
Phone #: ###-#### Internet Inspection Request from: josh strasser No answer on telephone -- door locked. Re-schedule. 7/24/2003 1:58:45 PM
BLD-Framing/Rough-in5/29/20035/30/20035/30/2003APASS
DetailsJim Storey
josh dry wall shear nail; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/27/20035/28/20035/28/2003APASS
DetailsDave Hannah
JOSH; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in5/21/20035/22/20035/22/2003PFAIL
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: josh strasser c/n on site ok insulate 5/22/2003 4:40:41 PM
BLD-Framing/Rough-in5/16/20035/19/20035/19/2003ANR
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: josh strasser needs other trades r/i 5/19/2003 10:05:38 AM
BLD-Framing/Rough-in5/5/20035/6/20035/6/2003APART
DetailsDave Hannah
Shere wall inspection; Phone #: ###-#### Internet Inspection Request from: josh strasser ok to cover ext 5/6/2003 11:58:09 AM
BLD-Foundation3/27/20033/28/20033/28/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/27/2003 at 5:53:23 PM. Contact: ###-####.work in progress checked setbacks all look ok but crew only about 20 complete 3/28/2003 9:56:56 AM
BLD-Footing3/27/20033/27/20033/27/2003PPART
DetailsDave Hannah
chris; Phone #: ###-#### Internet Inspection Request from: Annette Moore work in progress about 20% complete 3/27/2003 4:03:40 PM