BLD-Final | 3/2/2004 | 3/3/2004 | 3/3/2004 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/2/2004 at 11:51:36 AM. Contact: ###-####.
|
Permanent Occupancy | | 3/3/2004 | 3/3/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/18/2004 | 2/18/2004 | 2/18/2004 | | NR |
Jim Storey
|
|
|
pending counter top listed for fire shudder. 2/18/2004 9:43:31 AM
|
FIRE-Final Inspection | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/17/2003 at 3:47:17 PM. Contact: ###-####. air balance final report received - okay 12/18/2003 11:37:21 AM
|
BLD-Final | 12/15/2003 | 12/16/2003 | 12/16/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/15/2003 at 3:35:44 PM. Contact: ###-####. temp occ ok pending others sign off and reinsp. of listed counter top at kitchen passthrough at fire shutter to complet opening protection. 12/16/2003 4:20:34 PM
|
Code Occupancy Approval | 12/12/2003 | 12/12/2003 | 12/12/2003 | P | PASS |
Wm. Michael Meloy
|
|
|
compliance met. 12/12/2003 4:15:37 PM
|
FIRE-Alarm Testing | 12/11/2003 | 12/12/2003 | 12/12/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/11/2003 at 2:38:13 PM. Contact: ###-####.
|
BLD-Final | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | FAIL |
Jim Storey
|
|
|
arch. to submit listed counter top for fire shudder per ubc chapter 7 under nfpa 80 sec 12-3.1/ also handrail to meet code on stair to stage / letter of acceptance of field review of all ada compliance.
|
FIRE-Final Inspection | 12/10/2003 | 12/10/2003 | 12/10/2003 | A | FAIL |
Rick Jackson
|
|
|
door hardware on door to vestibule and door from classrooms; fire stop penetrations at stage wall; smoke seals on rated doors; FDC sign needed at FDC; need to test kitchen system; need updated alarm map; tampers and low air to be supervisory 12/10/2003 11:25:53 AM
|
BLD-Final | 12/9/2003 | 12/9/2003 | 12/9/2003 | P | NR |
Jim Storey
|
|
|
dan- ###-#### pending door hardware isues/ fire shuder counter listing requirments/fire testing to proceed 12/10 am. 12/9/2003 4:23:05 PM
|
BLD-Final | 12/2/2003 | 12/2/2003 | 12/2/2003 | P | NR |
Tom Arcoraci
|
|
|
Dan Updyke; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/20/2003 at 3:28:09 PM. Contact: ###-####.
|
BLD-Other | 11/21/2003 | 11/21/2003 | 11/21/2003 | P | PART |
Jim Storey
|
|
|
fire proofing patchs ok 11/21/2003 3:50:37 PM
|
BLD-Framing/Rough-in | 11/17/2003 | 11/18/2003 | 11/18/2003 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/17/2003 at 3:40:24 PM. Contact: ###-####. fire proffing patches/fire stopping occ and lid. 11/18/2003 3:02:31 PM
|
BLD-Framing/Rough-in | 9/15/2003 | 9/16/2003 | 9/16/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 4:03:09 PM. Contact: ###-####.mlb juatified. 9/16/2003 1:04:32 PM
|
BLD-Framing/Rough-in | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 2:53:40 PM. Contact: ###-####. truss web breacing/ 3 ply mlb support/ two ply truss over stage justify not done that way. 9/2/2003 11:24:31 AM
|
BLD-Conference | 8/25/2003 | 8/26/2003 | 8/26/2003 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/25/2003 at 9:51:53 AM. Contact: ###-####. 900 am apointment.w/dan. 8/25/2003 2:58:56 PM occ septration for kitchen not drawn on aproved plan tomeet code ubc 97 pending resolve to build. 8/26/2003 10:16:28 AM
|
BLD-Framing/Rough-in | 8/11/2003 | 8/12/2003 | 8/12/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/11/2003 at 10:23:50 AM. Roof nailing @ 6 & 12....OK CMST12 and CS16 staps installed over roof sheathing per detail....OK to roof. 8/12/2003 10:23:30 AM
|
BLD-Other | 7/10/2003 | 7/11/2003 | 7/11/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/10/2003 at 3:44:32 PM. Contact: ###-####.top out of massanary walls ok to grout. 7/11/2003 9:17:49 AM
|
BLD-Other | 7/8/2003 | 7/9/2003 | 7/9/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/8/2003 at 12:25:25 PM. Contact: ###-####.first 48 " grout pour ok 7/9/2003 11:33:43 AM
|
BLD-Other | 7/8/2003 | 7/9/2003 | 7/9/2003 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/8/2003 at 12:26:06 PM. Contact: ###-####.
|
BLD-Conference | 6/16/2003 | 6/17/2003 | 6/17/2003 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/16/2003 at 2:29:40 PM. Contact: ###-####.arch and mech engineer to review plan and define opening protection requriments of rated const. 6/17/2003 9:40:01 AM
|
BLD-Foundation | 6/2/2003 | 6/3/2003 | 6/3/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/2/2003 at 11:54:29 AM. Contact: ###-####. rebar ok pending special ins. report on concrete. 6/3/2003 9:19:43 AM
|
BLD-Conference | 5/27/2003 | 5/28/2003 | 5/28/2003 | A | PASS |
Jim Storey
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore SET UP FOR A CONF AT 9:00 AM WITH ARCH. AND DAN WITH CM CO. 5/27/2003 3:16:21 PM
|
BLD-Footing | 5/23/2003 | 5/27/2003 | 5/27/2003 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/23/2003 at 10:29:33 AM. special insp. report pending/ north p/l needs surved to verify 20 ft fence line per arch. is not 20 ft no p/l pins can be located. 5/27/2003 10:07:16 AM
|
BLD-Conference | 5/1/2003 | 5/1/2003 | 5/1/2003 | P | CANC |
Jim Storey
|
|
|
###-#### clint
|