Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-02919
StatusFinaled
Name OUR LADY OF THE ROSARY
Site Address 1500 E WRIGHT ST
Project NameOur Lady of the Rosary
Customer Number 
ePlanReviewNo
Description
Our Lady of the Rosary (Building Addition) - To add approximately 11,368 sq.ft of new floor area to the existing parish hall. Work to include remodeling of the existing facility, install new kitchen area, add exterior patio cover and storage building. All work is on the north side of the area separation wall. This permit includes reroofing the existing sanctuary with synthetic roof tile. All construction per the approved plans and attached comment list. NOTE This building is fully fire sprinklered for area increase. CUP 02-00062 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/2/20043/3/20043/3/2004APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/2/2004 at 11:51:36 AM. Contact: ###-####.
Permanent Occupancy 3/3/20043/3/2004 DONE
Details
BLD-Aging Inspection2/18/20042/18/20042/18/2004 NR
DetailsJim Storey
pending counter top listed for fire shudder. 2/18/2004 9:43:31 AM
FIRE-Final Inspection12/17/200312/18/200312/18/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/17/2003 at 3:47:17 PM. Contact: ###-####. air balance final report received - okay 12/18/2003 11:37:21 AM
BLD-Final12/15/200312/16/200312/16/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/15/2003 at 3:35:44 PM. Contact: ###-####. temp occ ok pending others sign off and reinsp. of listed counter top at kitchen passthrough at fire shutter to complet opening protection. 12/16/2003 4:20:34 PM
Code Occupancy Approval12/12/200312/12/200312/12/2003PPASS
DetailsWm. Michael Meloy
compliance met. 12/12/2003 4:15:37 PM
FIRE-Alarm Testing12/11/200312/12/200312/12/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/11/2003 at 2:38:13 PM. Contact: ###-####.
BLD-Final12/11/200312/11/200312/11/2003PFAIL
DetailsJim Storey
arch. to submit listed counter top for fire shudder per ubc chapter 7 under nfpa 80 sec 12-3.1/ also handrail to meet code on stair to stage / letter of acceptance of field review of all ada compliance.
FIRE-Final Inspection12/10/200312/10/200312/10/2003AFAIL
DetailsRick Jackson
door hardware on door to vestibule and door from classrooms; fire stop penetrations at stage wall; smoke seals on rated doors; FDC sign needed at FDC; need to test kitchen system; need updated alarm map; tampers and low air to be supervisory 12/10/2003 11:25:53 AM
BLD-Final12/9/200312/9/200312/9/2003PNR
DetailsJim Storey
dan- ###-#### pending door hardware isues/ fire shuder counter listing requirments/fire testing to proceed 12/10 am. 12/9/2003 4:23:05 PM
BLD-Final12/2/200312/2/200312/2/2003PNR
DetailsTom Arcoraci
Dan Updyke; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD-Framing/Rough-in11/20/200311/21/200311/21/2003ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/20/2003 at 3:28:09 PM. Contact: ###-####.
BLD-Other11/21/200311/21/200311/21/2003PPART
DetailsJim Storey
fire proofing patchs ok 11/21/2003 3:50:37 PM
BLD-Framing/Rough-in11/17/200311/18/200311/18/2003PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/17/2003 at 3:40:24 PM. Contact: ###-####. fire proffing patches/fire stopping occ and lid. 11/18/2003 3:02:31 PM
BLD-Framing/Rough-in9/15/20039/16/20039/16/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/15/2003 at 4:03:09 PM. Contact: ###-####.mlb juatified. 9/16/2003 1:04:32 PM
BLD-Framing/Rough-in8/29/20039/2/20039/2/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/29/2003 at 2:53:40 PM. Contact: ###-####. truss web breacing/ 3 ply mlb support/ two ply truss over stage justify not done that way. 9/2/2003 11:24:31 AM
BLD-Conference8/25/20038/26/20038/26/2003AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/25/2003 at 9:51:53 AM. Contact: ###-####. 900 am apointment.w/dan. 8/25/2003 2:58:56 PM occ septration for kitchen not drawn on aproved plan tomeet code ubc 97 pending resolve to build. 8/26/2003 10:16:28 AM
BLD-Framing/Rough-in8/11/20038/12/20038/12/2003APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/11/2003 at 10:23:50 AM. Roof nailing @ 6 & 12....OK CMST12 and CS16 staps installed over roof sheathing per detail....OK to roof. 8/12/2003 10:23:30 AM
BLD-Other7/10/20037/11/20037/11/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/10/2003 at 3:44:32 PM. Contact: ###-####.top out of massanary walls ok to grout. 7/11/2003 9:17:49 AM
BLD-Other7/8/20037/9/20037/9/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/8/2003 at 12:25:25 PM. Contact: ###-####.first 48 " grout pour ok 7/9/2003 11:33:43 AM
BLD-Other7/8/20037/9/20037/9/2003PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/8/2003 at 12:26:06 PM. Contact: ###-####.
BLD-Conference6/16/20036/17/20036/17/2003AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/16/2003 at 2:29:40 PM. Contact: ###-####.arch and mech engineer to review plan and define opening protection requriments of rated const. 6/17/2003 9:40:01 AM
BLD-Foundation6/2/20036/3/20036/3/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/2/2003 at 11:54:29 AM. Contact: ###-####. rebar ok pending special ins. report on concrete. 6/3/2003 9:19:43 AM
BLD-Conference5/27/20035/28/20035/28/2003APASS
DetailsJim Storey
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore SET UP FOR A CONF AT 9:00 AM WITH ARCH. AND DAN WITH CM CO. 5/27/2003 3:16:21 PM
BLD-Footing5/23/20035/27/20035/27/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/23/2003 at 10:29:33 AM. special insp. report pending/ north p/l needs surved to verify 20 ft fence line per arch. is not 20 ft no p/l pins can be located. 5/27/2003 10:07:16 AM
BLD-Conference5/1/20035/1/20035/1/2003PCANC
DetailsJim Storey
###-#### clint