Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-02979
StatusExpired
Name TESORO WEST COAST COMPANY
Site Address 321 N CURTIS RD
Project Name 
Customer Number 
ePlanReviewNo
Description
"HYDROCARBON VAPOR PROCESSING UNIT", Tesoro Petroleum * To install a VPU in order to reduce volatile organic compounds emissions. Work to include excavation and preparation for a structural reinforced slab to carry the dead load and lateral force overturn of the new 8 foot diameter by 45 foot tall Vapor Combustion Exhaust Stack. To reroute existing fuel supply lines above ground on extended existing supports to the existing fuel dispensing terminal. To install vapor removal piping from the existing bulk fuel dispensing station to the new Hydrocarbon Vapor Processing Unit and install the Thermal Oxidizing System. All per approved plans, national standards and attached engineering details. A Letter of Completion / Compliance" is required for this project. CUP02-00137 PC#775-02/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/15/20043/15/20043/15/2004 CANC
DetailsTom Arcoraci
BLD-Aging Inspection1/14/20041/14/20041/14/2004 NR
DetailsTom Arcoraci
BLD-Aging Inspection10/31/200310/31/200310/31/2003 NR
DetailsTom Arcoraci
BLD-Aging Inspection8/29/20038/29/20038/29/2003 PASS
DetailsTom Arcoraci
wip 8/29/2003 9:07:46 AM
BLD-Foundation3/20/20033/21/20033/21/2003PPASS
DetailsTom Arcoraci
russ; Phone #: ###-#### Internet Inspection Request from: Annette Moore