Permit Number | BLD02-02979 |
Status | Expired |
Name |
TESORO WEST COAST COMPANY
|
Site Address |
321 N CURTIS RD
|
Project Name | |
Customer Number | |
ePlanReview | No |
Description |
"HYDROCARBON VAPOR PROCESSING UNIT", Tesoro Petroleum * To install a VPU in order to reduce volatile organic compounds emissions. Work to include excavation and preparation for a structural reinforced slab to carry the dead load and lateral force overturn of the new 8 foot diameter by 45 foot tall Vapor Combustion Exhaust Stack. To reroute existing fuel supply lines above ground on extended existing supports to the existing fuel dispensing terminal. To install vapor removal piping from the existing bulk fuel dispensing station to the new Hydrocarbon Vapor Processing Unit and install the Thermal Oxidizing System. All per approved plans, national standards and attached engineering details. A Letter of Completion / Compliance" is required for this project. CUP02-00137 PC#775-02/drs
|