BLD-Final | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 2:42:12 PM. Contact: ###-####.
|
BLD-Final | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/22/2003 at 8:59:01 AM. Contact: ###-####. OK for Perm Occ. 8/22/2003 3:44:26 PM
|
FIRE-Final Inspection | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety, fire alarm and fire sprinklers finaled
|
Permanent Occupancy | | 8/22/2003 | 8/22/2003 | | DONE |
|
|
|
|
BLD-Final | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 8:40:09 AM. Contact: ###-####.
|
BLD-Final | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2003 at 8:40:09 AM. Contact: ###-####.
|
FIRE-Final Inspection | 8/20/2003 | 8/21/2003 | 8/21/2003 | A | CANC |
Troy Cobbley
|
|
|
technical problems with the induct detector circuit so the fire alarm system could not be finaled. Life safety is ready to final 8/21/2003 3:41:43 PM
|
BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 9:11:03 AM. Contact: ###-####. Remainder of ceiling grid OK. 8/7/2003 11:25:14 AM
|
FIRE-Sprinkler Rough-in | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | PASS |
Troy Cobbley
|
|
|
Don, ###-#### sprinkler piping is ok to cover 7/22/2003 2:55:46 PM
|
BLD-Other | 7/17/2003 | 7/17/2003 | 7/17/2003 | P | PART |
Steven Webb
|
|
|
Suspended ceiling -- Ok except kitchen ceiling--(requires completion) Ok to drop tiles pending required trades. 7/17/2003 3:28:23 PM
|
BLD-Framing/Rough-in | 6/11/2003 | 6/12/2003 | 6/12/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/11/2003 at 12:44:48 PM. Contact: ###-####. Soffits 6/12/2003 12:42:00 PM
|
FIRE-Conference | 5/30/2003 | 6/2/2003 | 6/2/2003 | A | DONE |
Troy Cobbley
|
|
|
I spoke with the general contractor about the placement of exit signs 6/2/2003 10:25:04 AM
|
BLD-Framing/Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/13/2003 at 4:49:43 PM. Contact: ###-####.
|