Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-02994
StatusFinaled
Name ELLAN GERMAN VETERINARY CLINIC
Site Address 8666 W OVERLAND RD
Project NameOVERLAND MARKET
Customer Number 
ePlanReviewNo
Description
(ELLAN GERMAN VETERINARY CLINIC) New 1,994 sq.ft. tenant space for use as a veterinary clinic in existing vacant shell building space per approved plans on file and CUP02-00151. Work to include new one-hour rated tenant demising wall, new interior walls, new interior doors, new exterior window in rear CMU exterior wall per engineering, new suspended ceiling, interior finish, new accessible restroom, cabinets/sinks, new mechanical work including new rooftop HVAC unit, new plumbing, and new electrical work. A Certificate of Occupancy is to be issued when completed and approved. The shell building was originally constructed in Ada County and later annexed into Boise City. Original shell building plans can be referenced under building permit BLD00-00304. NOTE: This building is fully fire sprinklered for area increase. (PC#0783-02) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/23/20036/23/20036/23/2003PPASS
DetailsRuss Owen
nick; Phone #: ###-#### Internet Inspection Request from: Annette Moore. ok for perm oc , c/n complete architect dedicated the counter to hc access with sign.6/23/2003 3:27:21 PM 6/23/2003 3:34:48 PM
BLD-Final6/11/20036/12/20036/12/2003AFAIL
DetailsRuss Owen
left over from yesterday. see notes from then.6/11/2003 5:52:12 PM 6/11/2003 5:52:28 PM Still needs fire life safety and prior c/n break room counter plugs need to move out for 24 in reach range. and need let another c/n.6/12/2003 10:40:44 AM 6/12/2003 10:53:52 AM
FIRE-Final Inspection6/12/20036/12/20036/12/2003PPASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Final6/10/20036/11/20036/11/2003PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 6/10/2003 at 12:09:07 PM. Contact: ###-####.Unable to do called to office by suppervisor. 6/11/2003 5:52:52 PM
FIRE-Final Inspection6/10/20036/11/20036/11/2003AFAIL
DetailsTroy Cobbley
DAN; Phone #: ###-#### Knox box has been installed but there is still no map for the facp and I need nfpa 72 record of completions 6/11/2003 1:06:52 PM
BLD-Final5/5/20035/6/20035/6/2003PPART
DetailsRuss Owen
DAN; Phone #: ###-#### Internet Inspection Request from: Darla Downsc/n posted for ele out lets reach ranges and accessible check out . OK temp if zoning would approve posted c/n. 5/6/2003 2:44:30 PM
Code Occupancy Approval5/6/20035/6/20035/6/2003PPASS
DetailsScott M.Brown
NO PLANNING REQUIREMENTS FINAL SIGNED OFF. 5/6/2003 1:33:24 PM
BLD-Final5/2/20035/5/20035/5/2003PFAIL
DetailsRuss Owen
dan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Not ready but did go over some req with builder. nothing writen. 5/5/2003 5:49:22 PM
FIRE-Final Inspection5/5/20035/5/20035/5/2003PPART
DetailsTroy Cobbley
A temporary occupancy was given until the fire alarm plans are approved and the system tested with Dave Millers permission.
BLD-Final5/1/20035/2/20035/2/2003PNR
DetailsRuss Owen
###-####Needs mec and fire prior to final . 5/2/2003 3:05:20 PM
FIRE-Final Inspection5/1/20035/2/20035/2/2003AFAIL
DetailsRick Jackson
###-#### talked to Troy about this and they are only to be approved a temp occ if and only if they get fire alarm plans in for review; as of today they haven't turned in any plans 5/2/2003 3:48:37 PM
BLD-Framing/Rough-in4/22/20034/23/20034/23/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 4/22/2003 at 2:55:00 PM. Contact: ###-####.Ceilng ok except I put a c/n next to approved plans, for round light fixtures to have a support wire. also called contractor. 4/23/2003 11:10:38 AM
BLD-Framing/Rough-in4/1/20034/2/20034/2/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 4/1/2003 at 7:33:40 AM. Contact: ###-####.Walls ok some plumbing needs re-inspection at rear area will be exposed as in other tennant space, call for ceiling grid talked with contractor on site. 4/2/2003 10:51:28 AM
BLD-Framing/Rough-in3/21/20033/24/20033/24/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/21/2003 at 7:17:33 AM. Contact: ###-####.Partial inspection only some walls not framed yet also left a c/n for break room area will not worl as shown. 3/25/2003 12:33:40 PM