BLD-Final | 3/6/2003 | 3/4/2003 | 3/4/2003 | P | PASS |
Russ Owen
|
|
|
ok for a perm oc, added this in on 3/6/03, my pc is down for repairs. 3/6/2003 1:26:31 PM
|
Permanent Occupancy | | 3/4/2003 | 3/4/2003 | | DONE |
|
|
|
|
BLD-Final | 3/3/2003 | 3/3/2003 | 3/3/2003 | P | NR |
Russ Owen
|
|
|
###-#### randy . Still working , called contractor will recall when ready. 3/3/2003 5:29:57 PM
|
BLD-Final | 2/27/2003 | 2/28/2003 | 2/28/2003 | P | FAIL |
Russ Owen
|
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. I called and left message with Randy, He called me back and I told him that at the time they paid the sewer fees, that same person was given information on the work area that was required to be accessible, as was indicated on permit writing. He said he will lower the cabinets to 34". NOTE: originally the sink had been crossed out on the floor plan, and apperently they elected not to put it in, and pulled a permit after plans were issued.Sewer fee have now been paid. 2/28/2003 4:01:07 PM
|
BLD-Final | 2/13/2003 | 2/13/2003 | 2/13/2003 | P | FAIL |
Russ Owen
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n. 2/13/2003 4:59:24 PM
|
BLD-Final | 2/12/2003 | 2/12/2003 | 2/12/2003 | P | CANC |
Russ Owen
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. This inspection was phoned in by the electrical contractor he wanted an electrical final not a building final. 2/12/2003 1:31:40 PM
|
BLD-Framing/Rough-in | 1/21/2003 | 1/22/2003 | 1/22/2003 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/21/2003 at 12:58:53. Contact: ###-####. ok per plan. 1/22/2003 10:41:59 AM
|