BLD-Aging Inspection | 1/15/2004 | 1/15/2004 | 1/15/2004 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 10/22/2003 | 10/23/2003 | 10/23/2003 | A | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 10/22/2003 | 10/22/2003 | 10/22/2003 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinklers, fire alarm and fire life safety OK
|
BLD-Aging Inspection | 9/8/2003 | 9/8/2003 | 9/8/2003 | | NR |
Tom Arcoraci
|
|
|
needs fire 9/8/2003 9:03:33 AM
|
BLD-Final | 4/29/2003 | 4/30/2003 | 4/30/2003 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/29/2003 at 12:53:49 PM. Contact: ###-####.
|
BLD-Final | 3/13/2003 | 3/14/2003 | 3/14/2003 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/13/2003 at 4:49:29 PM. Contact: ###-####.
|
FIRE-Final Inspection | 3/13/2003 | 3/14/2003 | 3/14/2003 | A | FAIL |
Troy Cobbley
|
|
|
###-####. Provide testing and sign off of the fire alarm permit, provide sign off of fire sprinkler permit, fire extinguishers are mounted too high and one is due for reinspection, remove thumbturns on all doors, per general notes on front page of approved drawings all door hardware is to be retrofitted for ADA compliance, repair or replace exit sign at front exit/entry 3/14/2003 12:59:25 PM 3/14/2003 1:00:00 PM
|
BLD-Framing/Rough-in | 2/13/2003 | 2/14/2003 | 2/14/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/13/2003 at 11:18:13 AM. Contact: ###-####.
|
BLD-Conference | 2/3/2003 | 2/4/2003 | 2/4/2003 | A | DONE |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 2/3/2003 at 4:28:14 PM. Contact: ###-####.Needsd to call for a framing inspection of rest room when r-i are done no new work on grid ceiling just replacement of grid, plans show adding ramp at entry for hight door for access contractor does not want to do this told him need to check with proje architect and plan review. 2/4/2003 12:53:15 PM
|