BLD-Final | 8/12/2004 | 8/13/2004 | 8/13/2004 | A | PASS |
Troy James
|
|
|
leeann ###-#### or ###-####
|
BLD-Final | 12/2/2003 | 12/3/2003 | 12/3/2003 | P | FAIL |
Dave Hannah
|
|
|
###-#### LEANN needs other trades signed off also needs handrail insulate basement open up beam in kitchen 12/3/2003 2:33:34 PM
|
BLD - Request for Extension | 11/6/2003 | 11/7/2003 | 11/7/2003 | A | PASS |
Dave Hannah
|
|
|
LEE ANN ###-#### ok to ext 11/7/2003 9:54:32 AM
|
BLD-Conference | 4/21/2003 | 4/22/2003 | 4/22/2003 | A | PASS |
Carl Dependahl
|
|
|
Perry, the rear of the house has to have add'l structure to "infill" the footprint...there was/is a large rear porch existing that the new foundation was poured to support. It leaves an area open to the exterior that will require structure over it. 4/22/2003 9:11:56 AM
|
BLD-Conference | 4/21/2003 | 4/21/2003 | 4/21/2003 | P | PASS |
Carl Dependahl
|
|
|
w/ Perry P...re add'l permit this project. 4/22/2003 9:08:26 AM
|
BLD-Foundation | 1/28/2003 | 1/28/2003 | 1/28/2003 | P | PART |
Carl Dependahl
|
|
|
walls poured, a-bolts installed. 1/28/2003 2:58:07 PM
|
BLD-Footing | 1/24/2003 | 1/24/2003 | 1/24/2003 | P | PART |
Carl Dependahl
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie....walls appear ok 1/24/2003 4:27:48 PM
|
BLD-Footing | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | PART |
Carl Dependahl
|
|
|
###-####...need plans, forms look ok 1/21/2003 4:52:04 PM
|