Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-03062
StatusFinaled
Name BOISE CITY AIRPORT
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(OUT POST CAFE - NEW BOISE AIR TERMINAL - 2ND FLOOR) This building is fully fire sprinklered. To construct a 2,163 square foot restaurant tenant space located on the 2nd floor of the new Boise City Air Terminal building. Work is to include interior nonbearing walls, interior finishes, suspended ceilings, a grease hood and duct, and millwork all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/18/20036/18/20036/18/2003PPASS
DetailsJim Storey
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection6/18/20036/18/20036/18/2003PPASS
DetailsRick Jackson
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Permanent Occupancy 6/17/20036/17/2003 DONE
Details
BLD-Final6/10/20036/10/20036/10/2003PPART
DetailsJim Storey
MARK; Phone #: ###-#### Internet Inspection Request from: Darla Downs final ok pending shell bld sign off/ and perm occ load sign. 6/10/2003 2:56:47 PM
FIRE-Final Inspection6/10/20036/10/20036/10/2003PFAIL
DetailsRick Jackson
jeff; Phone #: ###-#### Internet Inspection Request from: Barbara Moore awaiting testing of the fire alarms 6/10/2003 3:48:26 PM
BLD-Final5/19/20035/19/20035/19/2003PPART
DetailsJim Storey
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore occ load sign,others sign offs. 5/19/2003 4:12:31 PM
BLD-Framing/Rough-in5/1/20035/2/20035/2/2003AFAIL
DetailsJim Storey
ceiling= mark; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie missing fire proofing/ fire stopping at shaft not complet. 5/2/2003 9:16:56 AM
BLD-Conference4/30/20034/30/20034/30/2003PFAIL
DetailsJim Storey
termanation at gyp shaft and tape on all joints not complet per listing access door not done. 4/30/2003 5:30:31 PM
BLD-Other4/29/20034/30/20034/30/2003ACANC
DetailsJim Storey
MARK; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in4/16/20034/17/20034/17/2003PPART
DetailsJim Storey
MARK ; Phone #: ###-#### Internet Inspection Request from: Annette Moore shaft clearance ok to duct need fire stoping at lower penatations. 4/17/2003 3:22:04 PM
BLD-Framing/Rough-in3/24/20033/25/20033/25/2003PPART
DetailsJim Storey
mark; Phone #: ###-#### Internet Inspection Request from: Annette Moore floor sink penatrations complet. 3/25/2003 4:29:09 PM
BLD-Other3/21/20033/24/20033/24/2003ANR
DetailsJim Storey
Mark, ###-####
BLD-Conference3/19/20033/20/20033/20/2003APART
DetailsJim Storey
###-#### ###-#### shaft review ok 3/20/2003 2:10:02 PM
BLD-Foundation3/10/20033/11/20033/11/2003APART
DetailsJim Storey
###-#### ###-#### walls ok for cover pipe penatrations fier stopped/ floor sinks must be insp from bottom of floor for 2hr encapulation/ shaft and soffit supports pending insp ar later date. 3/11/2003 3:22:49 PM
BLD-Wall cover3/7/20033/10/20033/10/2003PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/7/2003 at 2:29:06 PM. Contact: ###-####.one side only ele panel/ plm pipe fire stopping 3/10/2003 4:07:42 PM