BLD-Final | 4/6/2004 | 4/6/2004 | 4/6/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/6/2004 at 10:54:50 AM. Contact: ###-####. OK FOR PERM OCC 4/6/2004 1:19:19 PM
|
Permanent Occupancy | | 4/6/2004 | 4/6/2004 | | DONE |
|
|
|
|
BLD-Final | 3/11/2004 | 3/12/2004 | 3/12/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/11/2004 at 3:24:05 PM. Contact: ###-####. ok for perm when others sign perm 3/12/2004 9:29:49 AM
|
FIRE-Final Inspection | 3/2/2004 | 3/2/2004 | 3/2/2004 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 3/2/2004 11:47:02 AM
|
BLD-Conference | 2/20/2004 | 2/20/2004 | 2/20/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/20/2004 at 7:30:17 AM. Contact: ###-####. hand rail ok 2/20/2004 10:05:28 AM
|
BLD-Energy code compliance | 1/12/2004 | 1/12/2004 | 1/12/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/12/2004 at 7:24:42 AM. Contact: ###-####. ok to cover 1/12/2004 8:48:30 AM
|
BLD-Framing/Rough-in | 1/8/2004 | 1/9/2004 | 1/9/2004 | A | PART |
Tom Arcoraci
|
|
|
1st floor need ok to insulate. 1/8/2004 2:14:05 PM ok to insul 1 st floor re check floor ceiling pents at drops 1/9/2004 9:21:15 AM
|
BLD-Framing/Rough-in | 1/8/2004 | 1/8/2004 | 1/8/2004 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 1/8/2004 at 11:23:32 AM. Contact: ###-####. called contractor told him that attic needs inspection will need to meet with a ladder. 1/8/2004 2:16:05 PM
|
BLD-Energy code compliance | 12/31/2003 | 12/31/2003 | 12/31/2003 | P | PART |
Tom Arcoraci
|
|
|
Odie ok to cover 2nd floor need to check 2 hr wall pents at attic 12/31/2003 3:11:05 PM
|
BLD-Conference | 11/20/2003 | 11/21/2003 | 11/21/2003 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/20/2003 at 8:34:17 PM. Contact: ###-####. NEED TO FINISH FIRE CAULKING IN DROPS 11/21/2003 2:55:32 PM
|
BLD-Energy code compliance | 11/6/2003 | 11/7/2003 | 11/7/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/6/2003 at 4:46:58 PM. Contact: ###-####.
|
BLD-Energy code compliance | 11/4/2003 | 11/5/2003 | 11/5/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/4/2003 at 1:01:04 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/3/2003 | 11/3/2003 | 11/3/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/3/2003 at 10:35:22 AM. Contact: ###-####.
|
FIRE-Conference | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | DONE |
Troy Cobbley
|
|
|
I spoke with Mike with Steed Construction about the placement of fire extinguishers. They need to be placed at each of the exit/entrances for a total of 6 extinguishers for each apartment block 10/24/2003 12:07:42 PM
|
BLD-Conference | 10/21/2003 | 10/22/2003 | 10/22/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/21/2003 at 5:12:41 PM. Contact: ###-####. wip ok 10/22/2003 1:17:09 PM
|
BLD-Conference | 10/20/2003 | 10/21/2003 | 10/21/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/20/2003 at 6:02:02 PM. Contact: ###-####.
|
BLD-Conference | 10/14/2003 | 10/14/2003 | 10/14/2003 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/14/2003 at 7:43:42 AM. Contact: ###-####. ok to side 10/14/2003 2:06:04 PM
|
BLD-Conference | 10/7/2003 | 10/8/2003 | 10/8/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/7/2003 at 5:44:23 PM. Contact: ###-####. 2 hr wall needs fix 10/8/2003 9:34:38 AM
|
BLD-Conference | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/30/2003 at 3:02:06 PM. Contact: ###-####.
|
BLD-Footing | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/30/2003 at 3:01:29 PM. Contact: ###-####.
|
FIRE-Conference | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/29/2003 at 1:00:07 PM. Contact: ###-####. Met with GC and electrician about smoke detectors; install in locations as shown on plans but they will be located close to the kitchen requiring silencing option; need 177 cd in ADA rooms 9/30/2003 12:35:54 PM
|
BLD-Conference | 9/17/2003 | 9/18/2003 | 9/18/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/17/2003 at 5:45:59 PM. Contact: ###-####. needs arch detail for floor 9/18/2003 10:36:02 AM
|
BLD-Conference | 9/10/2003 | 9/11/2003 | 9/11/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/10/2003 at 1:13:25 PM. Contact: ###-####.
|
BLD-Conference | 9/2/2003 | 9/3/2003 | 9/3/2003 | P | FAIL |
Russ Owen
|
|
|
2 hr wall at floor line not per plan met with contractor. build per plan or architect to supply new detail. 9/2/2003 10:14:13 PM
|
BLD-Conference | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 9/2/2003 at 11:19:12 AM. Contact: ###-####. out of time. 9/2/2003 6:04:04 PM
|
BLD-Framing/Rough-in | 9/3/2003 | 9/3/2003 | 9/3/2003 | P | FAIL |
Russ Owen
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Foundation | 7/30/2003 | 7/30/2003 | 7/30/2003 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 8:26:55 AM. Contact: ###-####. spec insp on site 7/30/2003 4:05:05 PM
|
BLD-Footing | 7/23/2003 | 7/23/2003 | 7/23/2003 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/23/2003 at 7:15:30 AM. Contact: ###-####. pending strata 7/23/2003 9:00:06 AM
|