BLD-Final | 4/11/2006 | 4/11/2006 | 4/11/2006 | P | PASS |
Jim Sly
|
|
|
Prev Finaled
|
DOC - Permit Finaled | 4/11/2006 | 4/11/2006 | 4/11/2006 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/9/2003 | 7/10/2003 | 7/10/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/9/2003 at 1:23:21 PM. Contact: ###-####.
|
FIRE-Final Inspection | 7/9/2003 | 7/10/2003 | 7/10/2003 | A | FAIL |
Troy Cobbley
|
|
|
duct smoke detectors in Block Buster do not shut down the hvac units 7/10/2003 8:53:11 AM
|
FIRE-Final Inspection | 7/10/2003 | 7/10/2003 | 7/10/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety for the shell and core finaled 7/10/2003 2:41:30 PM
|
BLD-Conference | 7/9/2003 | 7/9/2003 | 7/9/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/9/2003 at 9:24:09 AM.
|
FIRE-Conference | 7/8/2003 | 7/9/2003 | 7/9/2003 | A | DONE |
Troy Cobbley
|
|
|
Spoke with the contractor about curb painting for fire dept. access 7/9/2003 10:10:05 AM
|
BLD-Framing/Rough-in | 6/24/2003 | 6/24/2003 | 6/24/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/24/2003 at 8:20:34 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/17/2003 | 6/17/2003 | 6/17/2003 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/17/2003 at 6:43:12 AM. Contact: ###-####. All framing OK ....Still need firestopping 3hr wall. 6/17/2003 12:05:56 PM
|
BLD-Framing/Rough-in | 5/21/2003 | 5/21/2003 | 5/21/2003 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/21/2003 at 9:30:00 AM. Contact: ###-####. Ext Entrys and canopys OK pend special insp welding appr. 5/21/2003 3:21:45 PM
|
BLD-Concrete | 3/24/2003 | 3/25/2003 | 3/25/2003 | A | PART |
Jim Sly
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore Grouting CMU....MTI on site Stopped laying block...Rain. 3/25/2003 10:15:08 AM 3/25/2003 10:16:09 AM
|
BLD-Footing | 3/13/2003 | 3/14/2003 | 3/14/2003 | A | PART |
Jim Sly
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore Remainder of footing at North wall, and intermediate (N.S.) footing OK pending MTI insp and approvals. 3/14/2003 9:50:02 AM
|
BLD-Footing | 3/10/2003 | 3/12/2003 | 3/12/2003 | A | FAIL |
Jim Sly
|
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/N....Eng to OK fill at footings. 3/12/2003 10:15:05 AM
|