BLD-Final | 9/21/2004 | 9/22/2004 | 9/22/2004 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 9/21/2004 at 12:35:39 PM. Contact: ###-####. Ran out of time. 9/22/2004 10:02:24 AM
|
BLD-Final | 9/22/2004 | 9/22/2004 | 9/22/2004 | P | PASS |
Troy James
|
|
|
|
BLD-Grading Inspection | 9/22/2004 | 9/22/2004 | 9/22/2004 | | DONE |
|
|
|
Final grading and drainage approved
|
FIRE-Final Inspection | 9/21/2004 | 9/22/2004 | 9/22/2004 | A | DONE |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/21/2004 at 12:33:10 PM. Contact: ###-####. Fire not required to sign 9/22/2004 8:51:11 AM
|
BLD-Final | 8/24/2004 | 8/25/2004 | 8/25/2004 | A | CANC |
Troy James
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ran out of time 8/25/2004 10:09:55 AM
|
BLD-Final | 8/25/2004 | 8/25/2004 | 8/25/2004 | P | DONE |
Dave Hannah
|
|
|
meet at 2:00pm
|
BLD-Foundation | 6/8/2004 | 6/8/2004 | 6/8/2004 | P | PART |
Dave Hannah
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughesplanter and retainning wall ftgs 6/8/2004 4:16:22 PM
|
BLD-Energy code compliance | 2/20/2004 | 2/23/2004 | 2/23/2004 | A | PASS |
Troy James
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD-Framing/Rough-in | 1/21/2004 | 1/21/2004 | 1/21/2004 | P | FAIL |
Troy James
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
need nailing at hangers main level and positive plate attachment at corners exterior walls. ok to insulate 1/21/2004 3:38:35 PM
|
BLD-Energy code compliance | 12/30/2003 | 12/30/2003 | 12/30/2003 | P | PART |
Tony Young
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
ok to cover lower mechanical room walls pending trades 12/30/2003 4:13:00 PM
|
BLD-Framing/Rough-in | 12/29/2003 | 12/29/2003 | 12/29/2003 | P | PART |
Jim Storey
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes sheer ok/ ok to rock 3 mech rooms with reinsp on insulation levels at exterior walls of 2 rm,s. 12/29/2003 2:48:39 PM
|
BLD-Framing/Rough-in | 11/14/2003 | 11/14/2003 | 11/14/2003 | P | PART |
Dave Hannah
|
|
|
shear -bob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie nailing ok but missing two holddowns and two fl to fl straps 11/14/2003 1:27:54 PM
|
BLD-Foundation | 10/7/2003 | 10/7/2003 | 10/7/2003 | P | PASS |
Steven Webb
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore 2-pour in place concrete fireplace caps, rebar per plans. 10/7/2003 4:38:07 PM
|
BLD-Framing/Rough-in | 9/10/2003 | 9/10/2003 | 9/10/2003 | P | PART |
Russ Owen
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore. roof to concrete wall straps. 9/10/2003 12:41:20 AM
|
BLD-Foundation | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/28/2003 at 8:48:53 AM. Contact: ###-####.second pour on fire places 7/29/2003 12:29:09 PM
|
BLD-Foundation | 7/10/2003 | 7/14/2003 | 7/14/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/10/2003 at 9:06:08 AM. Contact: ###-####. fire places 7/14/2003 12:52:50 PM
|
BLD-Footing | 7/1/2003 | 7/1/2003 | 7/1/2003 | P | PART |
Dave Hannah
|
|
|
upper level walls 7/2/2003 8:36:36 AM
|
BLD-Foundation | 7/1/2003 | 7/1/2003 | 7/1/2003 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/1/2003 at 5:55:59 AM. Contact: ###-####.
|
BLD-Foundation | 6/24/2003 | 6/25/2003 | 6/25/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/24/2003 at 4:46:01 PM. upper nw walls 6/26/2003 7:14:58 AM
|
BLD-Foundation | 6/15/2003 | 6/16/2003 | 6/16/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/15/2003 at 9:35:17 PM. Contact: ###-####.
|
BLD-Foundation | 6/13/2003 | 6/13/2003 | 6/13/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/13/2003 at 10:05:54 AM. Contact: ###-####.upper area living roomnorth side 6/13/2003 1:35:52 PM
|
BLD-Foundation | 6/9/2003 | 6/10/2003 | 6/10/2003 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/9/2003 at 12:17:57 PM. Contact: ###-####. header over garage back walls of garage upper footings second pour on column 6/10/2003 10:56:03 AM
|
BLD-Foundation | 5/23/2003 | 5/23/2003 | 5/23/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/23/2003 at 8:07:05 AM. garage fronts 5/23/2003 1:19:08 PM
|
BLD-Foundation | 5/23/2003 | 5/23/2003 | 5/23/2003 | P | PART |
Dave Hannah
|
|
|
###-####
|
BLD-Foundation | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | PART |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moorefirst pour on four columns 5/21/2003 11:47:11 AM
|
BLD-Foundation | 5/13/2003 | 5/13/2003 | 5/13/2003 | A | PART |
Dave Hannah
|
|
|
high wall around garage ok to pour
|
BLD-Framing/Rough-in | 5/12/2003 | 5/13/2003 | 5/13/2003 | A | NR |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Grading Inspection | 5/8/2003 | 5/8/2003 | 5/8/2003 | | PASS |
Rita DeYoung
|
|
|
work in progress 5/8/2003 2:45:45 PM
|
BLD-Grading Inspection | 5/8/2003 | 5/8/2003 | 5/8/2003 | | PASS |
Rita DeYoung
|
|
|
Geotech engineer approved garage footing subgrade.
|
BLD-Footing | 5/6/2003 | 5/7/2003 | 5/7/2003 | A | PART |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore this the garage area and guest area crew is 75 % completed 5/7/2003 10:41:52 AM
|
BLD-Foundation | 4/23/2003 | 4/23/2003 | 4/23/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/23/2003 at 10:05:19 AM. BASE MENT WALLS ok to pour 4/23/2003 4:33:59 PM
|
BLD-Footing | 4/15/2003 | 4/15/2003 | 4/15/2003 | P | PART |
Dave Hannah
|
|
|
BOB; Phone #: ###-#### Internet Inspection Request from: Darla Downs basement level ok pour 4/15/2003 4:45:23 PM
|
BLD-Grading Inspection | 4/15/2003 | 4/15/2003 | 4/15/2003 | | DONE |
Rita DeYoung
|
|
|
GEOTECH ENGINEER HAS APPROVED THE FOOTING SUBGRADE
|