Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD03-00250
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1055 N CURTIS RD
Project NameST ALS-EAST LOBBBY ADDITION
Customer Number 
ePlanReviewNo
Description
(St. Alphonsus Medical Center, South Tower, East Lobby Demo & Shell Addition) - To demolish some exterior store front glazing and entry doors, interior partitions, ceilings, concrete slab area, mechanical, electrical, etc. at an approximate 2700 square foot area of the east entry lobby and office and out patient pharmacy areas in preparation for the renovation of this area; and to construct a new 563 square foot, one story, entry shell addition. This permit also includes the infill of an existing 20 lineal feet of the north exterior wall of the adjoining building. All construction per the approved plans and attached comment list. There is no occupancy allowed under this permit. These areas will be finished under tenant improvement permit BLD03-00379. PC# 56-03/JCM DRH02-00256
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/18/20042/18/20042/18/2004PPASS
DetailsTom Arcoraci
Tony, ###-####
BLD-Aging Inspection1/16/20041/16/20041/16/2004 NR
DetailsTom Arcoraci
Code Occupancy Approval  11/20/2003 PASS
LANDSCAPE PART OF DRIEWAY SO SIGNED FINAL.
BLD-Framing/Rough-in11/5/200311/6/200311/6/2003APASS
DetailsTom Arcoraci
tony; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in10/21/200310/21/200310/21/2003PFAIL
DetailsRuss Owen
Tony; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes . c/n grid ceiling. 10/21/2003 12:39:55 AM
BLD-Framing/Rough-in8/25/20038/26/20038/26/2003APART
DetailsTom Arcoraci
tony ; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip ok 8/26/2003 9:03:21 AM
BLD-Framing/Rough-in8/4/20038/4/20038/4/2003PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/4/2003 at 7:57:32 AM. Contact: ###-####. struc steel w/spec insp wip 8/4/2003 1:10:23 PM
BLD-Footing6/10/20036/10/20036/10/2003PPART
DetailsRuss Owen
###-#### tony. Teragon on site to perform special inspection. 6/10/2003 2:32:13 PM